
14
3
.
Preparation
(continue)
Be sure to read and understand on the page 3 to 7 “For safety operation” carefully before use
Installing ducting
(continue)
Important
Make sure that the following requirements for connecting ductwork are satisfied to ensure safe operation
and that the collector delivers maximum performance.
●
When branching the suction duct, interflow part should be smooth in order not to change the
change the direction and speed of airflow.
●
Secure the appropriate diameter of duct.If the diameter is too small,the air flow could lack. If the
diameter is too big, it cause malfunction or lacking of performance because of the dripping.
●
On the side of the machine tool occurred the oil mist, apart the source origin and suction port or
install the baffle plate in order not the cut powder putting in the collector.This collector is for
suctioning the foggy mist. If it is likely to suck the splay of oil, and leak from exhaust air, install the
baffle plate.
●
If the power is shut down frequentally because mist concentration is high or the air flow is low,
make sure to take in the secondary air from the suction port.
●
Always position the ducting between a machine tool and the mist collector on an angle to prevent
oil from accumulating inside the duct.
Ample
clearance
Battle plate
Position the duct at a gentle angle to prevent oil from accumulating in the duct.
To mist collector
To mist collector