
Operating Manual GC 5000 BTX; Version 5 – 11/2010
61
How to run initial validation:
1. Select
Menu bar
Run validation
Initial validation
Note
Before running a standard validation for the first time, an initial validation
has to be performed. As well it is necessary to run an initial validation after
each calibration. An initial validation has to be performed at any time, when
the validation gas has been changed.
Depending on the setting for “run initial validation after auto-calibration or
manual sequence” (see check box on window below)
the analyzer will run automatically an initial validation either directly when a
calibration sequence has been completed or during the next scheduled
validation run.
How to run standard validation:
There are two possibilities to run a standard validation. It depends on
whether to run it manually or automatically.
1. Start a run manually: select
Menu bar
Run validation
Standard validation
Alternatively:
2. Start an automatic run:
Press the “
Start
” button on the main screen.
The validation starts after the specified cycles or time as this parameter
have been set in the validation setup.
2. Step:
Run initial
validation
Automatic
initial validation
3. Step:
Standard
validation
Summary of Contents for The GC 5000 BTX
Page 1: ...Operating Manual Gas chromatograph GC 5000 BTX...
Page 35: ...Operating Manual GC 5000 BTX Version 5 11 2010 33 Fig 5 Connection of analog outputs...
Page 102: ...Operating Manual GC 5000 BTX Version 5 11 2010 100 Injection Waiting for end of cycle time...
Page 105: ...Operating Manual GC 5000 BTX Version 5 11 2010 103 Injection Waiting for end of cycle time...