
Operating Manual GC 5000 BTX; Version 5 – 11/2010
109
11.7 Run validation
The definition of a validation and the validation setup are described in
chapter 9.5.
Note:
The analyzer has to be stopped before starting a validation with this
menu.
These menu items are only enabled if
•
you have built-in calibration gas valves or
•
an external calibration gas module
Menu bar
Run validation
Initial validation
Here you can start an initial validation.
You have to do an initial validation after a new calibration or when you
changed the validation gas.
After selecting this menu item the analyzer starts to do the initial validation.
The analyzer stops after the run is completed.
Menu bar
Run validation
Standard validation
Here you can start a standard validation.
After you have selected this menu item the analyzer starts to do the
standard validation. The analyzer stops after the run is completed.
Menu bar
Run validation
Test
Level or input
Here you can start a test sample of a calibration level when using a
calibration module or an input when using calibration valves.
The analyzer stops after the run is completed.
Initial
validation
Test
Standard
validation
General
Summary of Contents for The GC 5000 BTX
Page 1: ...Operating Manual Gas chromatograph GC 5000 BTX...
Page 35: ...Operating Manual GC 5000 BTX Version 5 11 2010 33 Fig 5 Connection of analog outputs...
Page 102: ...Operating Manual GC 5000 BTX Version 5 11 2010 100 Injection Waiting for end of cycle time...
Page 105: ...Operating Manual GC 5000 BTX Version 5 11 2010 103 Injection Waiting for end of cycle time...