SW1000 Installation and Operation Instructions
Page 38
For Assistance: [email protected] +1 (909) 591-8431 PUD3448R2-1
Appendix C - Portable Baseplate Installation
Figure C2
The baseplate enables installation of the SW1000 on a solid foundation without the need to drill hoes into
the concrete. The baseplates also provides concealed conduit channels for wiring primary power, crossover
communication, and access control. Baseplates may be bridged together for multi-lane configurations. The
following information will guide the installer in baseplate installation:
1. Determine and mark the installation location.
2. Place the baseplate in the marked location.
3. Determine how the primary power and access control wiring will be routed to the master and/or center
cabinet. Most commonly, the wiring is run into the baseplate through one of the side plates and routed
to the master and/or center cabinet. To remove the side plate, remove the four (4) screws as shown in
[Figure C2].
4. Use the center cable channel to route the primary power, crossover cable, and access control wires.
5. Mount the SW1000 tower to the baseplate at the anchor location using the supplied mounting bolts.
6. For multi-lane applications, bridge the baseplates using the supplied bridge support(s) and screws.
7. Reinstall side plate(s).