SW1000 Installation and Operation Instructions
PUD3448R2-1
For Assistance: [email protected] +1 (909) 591-8431
Page 35
J15 Connector (Master Gate)
Figure A5
TB6-1, TB6-2 (Slave Gate)
Figure A6
Communication Crossover Cable
Communication is run from the master gate to the slave gate using the communication crossover cable
(10-1306)
.
Follow the instructions below to connect communication to the slave gate.
1. Locate the communication crossover cable shipped
with the slave gate.
2. On the master gate, connect the wire harness to
the motor controller board J15 connector labeled
Master Connections [Figure A5].
3. On the slave gate, connect the bare wires to TB6-1
(black) and TB6-2 (white) [Figure A6].