SW1000 Installation and Operation Instructions
Page 12
For Assistance: [email protected] +1 (909) 591-8431 PUD3448R2-1
Correct Gate Orientation
Figure 6
Signal Inputs and Outputs To / From Access Control System
Inputs
- Signal inputs from outside systems are wired into the TB1 and TB3 terminal blocks. There are two types
of input signals: momentary dry contacts (MDC) and sustained dry contacts (SDC). All input signals must be
normally open, voltage-free, dry contacts, with the exception of the fire alarm input, which can be configured (via
TB1-5 terminal) to accept either a normally open or normally closed sustained contact. MDCs must be at least
100ms in duration to register.
Barrier Breakaway Output
– This output is found on the TB9 terminal block. Signal output is normally open,
voltage-free, momentary dry contact. The output signal length is 500ms in duration.
It is the installer's responsibility to ensure the following steps are completed before beginning the
installation.
1.
All components and hardware have been unpacked, correctly identified, and moved to the installation location.
2.
The gate configuration and layout has been confirmed with the site manager.
3. All pre-Installation requirements have been met.
Communication Requirements
Gate Orientation
Pre-Installation Checklist
Environmental Requirements
• DO
NOT
install the product outdoors. This product is intended for indoor use only.
The following are suggested operating temperature and humidity ranges for the SW1000:
Operation
Non-Operation/Storage
Temperature Range
10° - 32°C / 50° - 90°F
0° - 40°C / 32° - 104°F
Humidity Range (Non-Condensing)
15% - 85% RH
--
Operating the SW1000 outside the suggested temperature and humidity ranges may
negatively affect gate performance and could potentially cause damage to gate components.
CAUTION
Unsecured Side
Secured Side
The default orientation for a single gate locates the tower on the right-hand side when viewed from the unsecured side
[Figure 6].
Tower