SW1000 Installation and Operation Instructions
PUD3448R2-1
For Assistance: [email protected] +1 (909) 591-8431
Page 11
Electrical Requirements
Conduit Requirements
Power Supply
100 - 240 VAC. 6.0 A, 50/60 Hz
Power Requirements
Peak power consumption is 228 watts per gate with all options installed.
Operational Voltage
Primary power is stepped down and rectified for low-voltage 24 VDC, 12 VDC and
5 VDC operation.
Fuse
3A (slo-blo) fuse is installed on each gate.
Surge Protection
Alvarado suggests the use of surge protection on the high-voltage power line to
further protect electronics
Drive Motor
24V BLDC
Seal the floor area around the conduits running up and into the base plate. This will prevent condensation and
debris build-up coming from whatever may be below the floor.
NOTE
Conduit
Figure 5
•
Use full-sweep electrical conduit underneath the floor.
• Use separate conduits for primary power, access control, and crossover cable (tandem installations only).
• The conduit opening must not exceed 2.5" (63mm) in diameter.
•
The conduit must not extend above the baseplate or .25" (6mm) above the finished floor.
Access Control Conduit
Primary Power Conduit
Conduit
Conduit Opening