![Alstom MiCOM P50 Agile P15D Technical Manual Download Page 51](http://html1.mh-extra.com/html/alstom/micom-p50-agile-p15d/micom-p50-agile-p15d_technical-manual_2908934051.webp)
P50 Agile P15D
5 Configuration
P15D/EN TM/B
5-15
2.3.4.2
View settings
CB CONTROL
Press the Minus / Right arrow key (- /
) to view the CB Control settings.
Trip Test
Enabled
This window shows the Trip Test setting done previously.
Press the Plus / Up arrow key (+ /
) to move to the next option. ***
Trip Block
Enabled
This window shows the Trip Block setting done previously.
Press the Plus / Up arrow key (+ /
) to move to the next option. ***
Latch Relay
Enabled
This window shows the Latch Relay setting done previously.
Press the Plus / Up arrow key (+ /
) to move to the next option. ***
Trip Test
Enabled
The window displays the first setting of the CB Control.
Press the Left arrow key (
) or Right arrow key (
) to return to the
Main Menu.
CB CONTROL
Note:
*** By using the Left arrow key (
) or Right arrow key () the relay will return to Main Menu.
2.3.5
DATE AND TIME MENU
2.3.5.1
Edit settings
DATE AND TIME
Password protected window for “DATE AND TIME” settings i.e. Local
Time Enable, Local Time Offset, DST Enable, DST Offset, DST Start,
DST Start Day, DST Start Month, DST Start minutes, DST End, DST
End Day, DST End Month, DST End minutes, RP Time Zone, SET
Hours, SET Minutes, SET Seconds, SET Date, SET Month, SET Year,
Press the Left arrow key (
) to move to the next option.
Summary of Contents for MiCOM P50 Agile P15D
Page 2: ......
Page 3: ...P50 Agile P15D 1 Introduction P15D EN TM B 1 1 INTRODUCTION CHAPTER 1...
Page 4: ...1 Introduction P50 Agile P15D 1 2 P15D EN TM B...
Page 9: ...SAFETY INFORMATION CHAPTER 2...
Page 10: ...Safety Information Pxxx 2...
Page 21: ...P50 Agile P15D 3 Hardware Design P15D EN TM B 3 1 HARDWARE DESIGN CHAPTER 3...
Page 22: ...3 Hardware Design P50 Agile P15D 3 2 P15D EN TM B...
Page 28: ...3 Hardware Design P50 Agile P15D 3 8 P15D EN TM B...
Page 29: ...P50 Agile P15D 4 Front Panel P15D EN TM B 4 1 FRONT PANEL CHAPTER 4...
Page 30: ...4 Front Panel P50 Agile P15D 4 2 P15D EN TM B...
Page 35: ...P50 Agile P15D 4 Front Panel P15D EN TM B 4 7 Figure 2 USB Port...
Page 36: ...4 Front Panel P50 Agile P15D 4 8 P15D EN TM B...
Page 37: ...P50 Agile P15D 5 Configuration P15D EN TM B 5 1 CONFIGURATION CHAPTER 5...
Page 38: ...5 Configuration P50 Agile P15D 5 2 P15D EN TM B...
Page 130: ...5 Configuration P50 Agile P15D 5 94 P15D EN TM B...
Page 131: ...P50 Agile P15D 6 Protection Functions P15D EN TM B 6 1 PROTECTION FUNCTIONS CHAPTER 6...
Page 132: ...6 Protection Functions P50 Agile P15D 6 2 P15D EN TM B...
Page 142: ...7 Protection Parametre Settings P50 Agile P15D 7 2 P15D EN TM B...
Page 154: ...7 Protection Parametre Settings P50 Agile P15D 7 14 P15D EN TM B...
Page 155: ...P50 Agile P15D 8 Monitoring Control P15D EN TM B 8 1 MONITORING CONTROL CHAPTER 8...
Page 156: ...8 Monitoring Control P50 Agile P15D 8 2 P15D EN TM B...
Page 162: ...8 Monitoring Control P50 Agile P15D 8 8 P15D EN TM B...
Page 163: ...P50 Agile P15D 9 External Battery Backup P15D EN TM B 9 1 EXTERNAL BATTERY BACKUP CHAPTER 9...
Page 164: ...9 External Battery Backup P50 Agile P15D 9 2 P15D EN TM B...
Page 168: ...10 Impulse Output for Tripping Coil P50 Agile P15D 10 2 P15D EN TM B...
Page 172: ...11 Impulse for Flag Indicator P50 Agile P15D 11 2 P15D EN TM B...
Page 175: ...P50 Agile P15D 12 SCADA Communications P15D EN TM B 12 1 SCADA COMMUNICATIONS CHAPTER 12...
Page 176: ...12 SCADA Communications P50 Agile P15D 12 2 P15D EN TM B...
Page 187: ...P50 Agile P15D 13 Installation P15D EN TM B 13 1 INSTALLATION CHAPTER 13...
Page 188: ...13 Installation P50 Agile P15D 13 2 P15D EN TM B...
Page 206: ...13 Installation P50 Agile P15D 13 20 P15D EN TM B...
Page 208: ...14 Technical Specifications P50 Agile P15D 14 2 P15D EN TM B...
Page 219: ...P50 Agile P15D 15 Wiring Diagrams P15D EN TM B 15 1 WIRING DIAGRAMS CHAPTER 15...
Page 220: ...15 Wiring Diagrams P50 Agile P15D 15 2 P15D EN TM B...
Page 223: ......