15
3.1 INTERFACING TO ONE OR MORE ADAT'S
The AI-2 is used to connect one or more ADATs to a control
system. The basic ADAT connection is shown here. When the AI-2
is powered on it takes control of the ADAT chain and automatically
assigns machine IDs to the connected ADATs. Although by itself
the AI-2 cannot control the ADAT chain, if a reference source is
connected to the AI-2, when the ADAT transports are put into play
locally, the speed of the transports will be resolved to the selected
reference by the AI-2.
Connect a standard Alesis ADAT interconnect cable between the
AI-2 9-pin SYNC OUT connector and the SYNC IN connector of the
"master", or first, ADAT. Connect additional ADATs, SYNC OUT to
SYNC IN as described in the ADAT reference manual.
AI2007A
–10 dBV ANALOG INPUTS
+4 dBu ANALOG
OPTICAL
DIGITAL
INPUT
DIGITAL
OUTPUT
INPUT
OUTPUT
–10 dBV ANALOG OUTPUTS
SYNC
METER BRIDGE
FOOTSWITCHES
OUT
IN
LOCATE/PLAY
LRC REMOTE
PUNCH
IN/OUT
POWER REQUIREMENTS
90-260 VAC
50-60 Hz
50 WATTS MAX
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
Sync Out
Sync In
MASTER ADAT
SLAVE ADAT
–10 dBV ANALOG INPUTS
+4 dBu ANALOG
OPTICAL
DIGITAL
INPUT
DIGITAL
OUTPUT
INPUT
OUTPUT
–10 dBV ANALOG OUTPUTS
SYNC
METER BRIDGE
FOOTSWITCHES
OUT
IN
LOCATE/PLAY
LRC REMOTE
PUNCH
IN/OUT
POWER REQUIREMENTS
90-260 VAC
50-60 Hz
50 WATTS MAX
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
ALESIS AI-2
CONTROLLING ONE OR MORE ADAT'S (BASIC INTERFACE)
Sync In
Sync Out
REFERENCE
W/C IN
RDR IN
VID IN
CONTROL
LYNX-2 / MICRO LYNX
MIDI
OUT
IN
BRC
MIDI
OUT
IN
THRU
GEN OUT
W/C OUT
SYNC OUT
ADAT
POWER
CONFIG
EDITOR
S/N
MANUFACTURED BY
TimeLine Vista, Inc.
MADE IN USA
ALESIS CORPORATION, LOS ANGELES
CAUTION: TO PREVENT ELECTRICAL SHOCK DO NOT REMOVE COVERS. NO USER SERVICEABLE PARTS INSIDE. REFER SERVICING TO QUALIFIED SERVICE PERSONNEL.
THIS DEVICE COMPLIES WITH PART 15 OF THE FCC RULES. OPERATION IS SUBJECT TO THE FOLLOWING TWO CONDITIONS: (1) THIS DEVICE MAY NOT CAUSE
HARMFUL INTERFERENCE, AND (2) THIS DEVICE MUST ACCEPT ANY INTERFERENCE RECEIVED, INCLUDING INTERFERENCE THAT MAY CAUSE UNDESIRED OPTERATIONS.
When all the connections have been made, and the units powered
on, the BRC/ADAT LED on the front panel of the AI-2 should be
illuminated, to indicate that valid communication is occurring
between the AI-2 and the ADAT units. If the LED does not light (no
communications) or is flashing (communication taking place, but
with errors) then recheck the cable connections.