
2. Installation of the Switch
AirLive POE-FSH2422G-250 User’s Manual
6
2
2.
Installation of the
Switch
This chapter provides the detailed instructions for installation of the switch. For concise
installation instruction, the previous chapter’s “Quick Setup” section provides all the
important information including IP address, password, and LED table for user’s reference.
2.1 Unpack the Package
Before you begin the installation of POE-FSH2422G-250 Management Switch, make sure
that you have all the necessary accessories that come with your package. Follow the
steps below to unpack your package contents:
Clear out an adequate space to unpack the package carton.
Open the package carton and take out the contents carefully.
Put back all the shipping materials such as plastic bag, padding and linings into the
package carton and save them for future transport need.
After unpacking and taking out the entire package contents, you should check whether you
have got the following items:
POE- FSH2422G-250 24-Port 802.3af PoE Switch
One AC power cord
Quick Install Guide
Support CD-ROM (The PDF version of this User’s Manual can be found within)
One pair Rack-mount kit + 8 Screws
If any of these above items is missing or damaged, please contact your local dealer for
replacement.