S220/S221/S230/S231/Z200
8-15
Maintenance
8
Figure 8-32
Figure 8-33
8.2.18.5 Front cardan shaft
CAUTION
The cardan shaft must be lubricated
every 50
operating hours
(8-31/arrow and 8-32/arrow).
8.2.18.6
Ball bearing ring
The grease filling is to avoid friction and to provide sealing
and protection against corrosion. Therefore, the ring must
be lubricated
every 10 operating hours
until grease
becomes visible on the outside. When lubricating the ball
bearing ring, swivel the bucket arm by 20° at a time. Then
lubricate all four grease nipples (8-33/arrows) at each
stage. It is absolutely necessary to lubricate the machine
before and after a longer period of inactivity.
DANGER
-
Before you start lubricating, mechanically
support the bucket arm [e.g. by inserting the
bucket arm support (optional ) (1-1/arrows)],
apply the parking brake (4-9/7) and set the
drive direction switch (4-9/5) to the „0“ position.
-
During
swivelling, no-one may be present in
the swivel area of the bucket arm.
Figure 8-31
Summary of Contents for AS 210
Page 7: ...Safety Regulations ...
Page 19: ...Signs ...
Page 22: ...ProtectionAgainstTheft ...
Page 25: ...Description ...
Page 33: ...Operation ...
Page 44: ...Attachments ...
Page 53: ...Rescue Towing Lashing Lifting by Crane ...
Page 60: ...Maintenance ...
Page 78: ...Faults Causes and Remedies ...
Page 81: ...Diagrams ...
Page 98: ...Technical Data Loader ...
Page 102: ...Technical Data Attachments ...
Page 115: ...AdditionalOptions Modifications Notes on Inspection for Loaders ...