When the label tag has been printed, the machine shows all errors it
has registered since the heating element was removed for the change-
over stage, or, that no error occurred at all. This info message can be
acknowledged by pressing the
button.
4.8 Additional Preparatory Steps for Overhead Welding Operations
Mark and fence off the worksite particularly largely and visibly, in order
to prevent any unauthorized access.
The platform or scaffold that is used has to be set up safely
and in compliance with all rules applicable at the place of
the operation. All workers are required to wear the manda-
tory personal protective gear.
Using the belts, fasten the mechanical structure of the weld-
ing system securely to an element of the building, but
never
to the components to be jointed
. Preferably, the lighter
and/or easier moving component of the two to be jointed is
clamped into the movable carriage of the mechanics.
Caution
An overhead welding operation requires two persons. The plat-
form or scaffold has to be large enough to make room for both
workers and all needed tools. It is of particular importance that
there is sufficient space around the joint to allow for removing
the heating element at change-over without any risk of burns.
If an extension cable is needed for an overhead welding operation, be