2 Quick Setup Guide
Before the monitor arrives
(for full pre-planning details see section 2.2)
1. Visit the site and assess monitor location and suitability
Site will be representative of the pollutants you intend to measure.
Site is secure but with adequate access.
Site is appropriately open to all wind directions.
If you are planning a permanent deployment, check that there is nothing nearby
which could change and affect your project
– like trees, planned buildings or new
roads and other potential interferences.
2. Ensure power is available on site
Ensure power is available Both Mains and Solar power can be used, but these
will need to be available and/or installed before the monitor arrives.
When installing power outlets (110 VAC to 230 VAC) for the monitor, they should
be weatherproof and installed safely.
Allow for 2 power outlets, one for the monitor and one for calibration equipment.
NOTE: A power lead with local plug will need to be supplied and wired to a connector
supplied with the monitor.
3. Install any additional infrastructure required for the installation
Mounting location and method has been identified. Most sites will require a way
of securely mounting the monitor. Pole Brackets (50.8 mm / 2
“ 304 Stainless U-
Bolt) are included to mount the monitor on a pole, anchored to the ground. Small
platforms have also been used successfully too.
If you have ordered Auxiliary sensors (Weather, noise etc.) you will need to
provide a means of mounting these also. You will need to supply a pole and
fixings to mount the sensor. Siting may be subject to local regulations.
Check you have the required tools.
4. Confirm communications specification (WIFI and/or cellular)
Check communications specifications and how the monitor software will be
accessed on site
For cellular access, purchase a dynamic IP network SIM card with at least 1 GB
data / month.
5. Plan for your time on site
When setting up for the first time allow at least four hours on site.
Allow for travel time to and from the site.
Confirm site operation times available for access.
Confirm personal protective equipment (PPE) that may be required on site.
6. Read the user guide
Familiarise yourself with the assembly steps.
Confirm the method of data access that will be supplied with the monitor (e.g.
Aeroqual Connect or Aeroqual Cloud).
Send any questions about things you are unsure about to
7. Write a checklist
Write your own checklist to ensure a smooth installation and setup.
Include any reporting requirements that will be required.