After the monitor arrives
1. Unpack the monitor and inspect
Inspect the packaging and monitor for damage.
Check all items have been supplied
NOTE:
A power lead with local plug will need to be supplied and
wired to a connector supplied with the monitor.
Section 2.3
2. Mount monitor
Mount the monitor to your platform or pole.
Attach the PM inlet.
Attach the gas inlet.
Open the door and check that all tubing, power and data
connections are secure.
Section 2
Section 2.4.1
Section 2.4.3
3. Power on the unit
Turn on the unit by pushing in the fuse.
Check that the Status LEDs on the modules, Embedded PC
and Modem (if fitted) are on and green.
Check that the sampling pump (PM only) or pumps (PM and
Gas) are running.
Section 2.5.4
4. Set up Wi-Fi / Modem and connect to the monitor
Connect to Aeroqual Connect
Connect to Aeroqual Cloud
5. Check sampling flow rates
Put the monitor into Service mode
Write a comment in the Journal that you are on site for
monitor commissioning.
Check the sampling system for leaks, rectify any leaks.
Check and adjust gas module flow rates to specification.
Check PM inlet flow rates and adjust if required.
Section 5.1
Section 6.4
Section 6.5.4
Section 6.5.4.2
Section 6.5.4.3
6. Attach optional auxiliary sensors
If you have purchased any auxiliary sensors (Weather,
Noise) mount these and run the cabling through the external
glands, and connect to the AUX module.
Section 2.6
7. Document setup in Journal
Note in the Journal that commissioning is complete.
Exit Service mode.
Installation and commissioning
Commissioning is the process of setting up a new monitor to work correctly on site. It is important that
the correct procedure for commissioning the monitors is followed to ensure reliable monitor operation
and to meet or exceed your data quality objectives. All monitors are supplied with a traceable factory
calibration. This calibration is applicable to the commissioning phase and accordingly Aeroqual does
not recommend an initial calibration as part of monitor commissioning.
Aeroqual provides a commissioning procedure which should be completed during this period. This
report details the tasks carried out during commissioning, and can be used to demonstrate correct
commissioning to end customers.
The commissioning procedure is available from:
https://www.aeroqual.com/support/resources/aqm-65
NOTE:
Please allow at least 30 min for the monitor to warm up to counter the effects of humidity.
Complete the Commissioning report and provide to customer
This report details the settings of the monitor at the time of commissioning. The completed report
should be provided to the customer, along with the factory logbook which is provided with every
monitor.