STARTUP RECORD FOR
ESTEEM 399
BOILER -
(Continued)
Venting
How many elbows are in the ducting? ____
Is the vent sealed with RTV?
Yes
No
Is the vent pitched back toward the boiler (1/4" per ft. length) per the AERCO Venting Guide?
Yes
No
Venting material used is:
AL29-4C
Other (please specify):
Venting manufacturer is:
Please describe venting configuration (check all that apply):*
Individual Vent
Sidewall Termination Roof Termination
Breeched/Common (Units Vented Together)
Combustion Air
Combustion air supplied through (check all that apply):
Louvers to outside wall vent
Horizontal ducting
Direct or Sealed Combustion
Louvers to another room
Vertical ducting
Combustion air fan
If using sealed combustion, what is the size of the ducting to the unit?
If using sealed combustion, is an AERCO Air Inlet Adapter installed?
Yes
No
If combustion air is ducted, are there two (2) ducts—one high and one low?
Yes
No
Boiler Installation
Are balancing valves or circuit setters installed?
Yes
No
Has the water flow been balanced between the units?
Yes
No
What is the maximum flow rate through the unit?
GPM
Is the unit interlock utilized?
Yes
No
If yes, is it interlocked to:
Flow switch
Energy Management System
Damper end
switch
Other
Is the
system:
Water Source Heat
Pump
Primary/Secondary
Pumping
Used for Reheat
A Variable Flow
System
Other
Combustion Settings
CO
2
: _______________% Measured Rate of Input: _________________ Btu/hr
O
2:
_______________%
CO: _______________ppm