GF-135
Esteem 399 Low NOx Boiler
Chapter 18
OMM-0089_0A
Installation, Operation & Maintenance Manual Controller Operation
Page
119
of
188
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
OMM-0089_0A
MC1 06/19/14
Ph.: 800-526-0288
The Installer Menu is divided into four selections as follows:
•
CH and DHW Settings Menu:
Selections in the CH and DHW Settings Menu allow the installer to adjust the boilers
central/space heating and domestic hot water settings for the application. See section 18.3.
•
Reset All Settings:
Pressing this allows you to choose to reset all CH, DHW, and Cascade settings back to the
factory defaults. See Section 18.5.
•
Cascade Menu:
Selections in the Cascade Menu allow the installer to setup, adjust, and monitor the Cascade
System. See Section 18.6.
•
Manual Operation Menu:
Selections in the Manual operation Menu enable the burner and circulators to be manually
enabled for testing. See Section 18.9.
The INSTALLER Menu structure is diagrammed on the next page (Figure 18-5).