GF-135
Esteem 399 Low NOx Boiler
Chapter 14
OMM-0089_0A
Installation, Operation & Maintenance Manual Ext. Modulating Control
Page
104
of
188
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
OMM-0089_0A
MC1 06/19/14
Ph.: 800-526-0288
Table 14-1: Esteem Boiler Factory Settings
Heating Settings
Factory Default EZ Setup Reset Installer Reset
Heating Operation
Enabled
Demand
Switch & Outdoor
Reset
Absolute Max CH Setpoint
194°F [90°C]
CH1 Maximum Setpoint
180°F [82°C]
CH1 Minimum Setpoint
120°F [49°C]
Reset Curve Coldest Day
0°F [-18°C]
Reset Curve Warmest Day
64°F [18°C]
CH2 Circuit
Enabled
CH2 Maximum Setpoint
140°F 60°C]
CH2 Minimum Setpoint
80°F [27°C]
Warm Weather Shutdown
OFF
Pump Constant Circulation
Disabled
CH Post Pump Time
1 minute
Freeze Protection
Enabled
Frost Protection Setpoint
-22°F [-30°C]
Parallel Shift Value
0°F [0°C]
CH Call Blocking
1 minute
System Pump
CH1/CH2
Domestic Settings
Factory Default EZ Setup Reset Installer Reset
DHW Operation
Enabled
Esteem Model
399
Demand
Switch
Boiler DHW Setpoint
186°F [86°C]
DHW Storage Setpoint
140°F [60°C]
DHW On Differential
6°F [3°C]
DHW Storage Adder
46°F [25°C]
DHW Post Pump Time
1 minute
DHW Priority Timeout
OFF
DHW Priority
Enabled
DHW Call Blocking
0 minute
DHW to CH Call Blocking
1 minute
Antilegionella Function
Disabled
Boiler Settings
Factory Default EZ Setup Reset Installer Reset
Lockout Temperature
210°F [99°C]
Modbus Address
0=BCST