![Advantech DLT-V6210 Manual Download Page 29](http://html1.mh-extra.com/html/advantech/dlt-v6210/dlt-v6210_manual_2857409029.webp)
Electrical installation, cable connection, cable cover
© by DLoG GmbH
DLT-V6210 Manual V1.00
Page 29 / 61
8.4.1.
Plugging in and screwing on the power supply cable
Fig. 8.4: The power supply cable secured
Plug the power supply cable into the power
supply plug-in location.
Tighten both mounting screws hand-tight.
8.4.2.
Securing the ground using ring tongue to the ground bolt
Fig. 8.5: Ring tongue secured to the ground bolt
Secure the ring tongue of the power supply cable to the ground bolt.
ATTENTION
: To make sure the device is
grounding correctly, it is important to follow the
correct order to put the components on the
ground bolt as below (from inside to outside):
1. Place
“toothed washer“
first (internal).
2. Then put the “
Ring Tongue of the power
supply cable
” (flat side faces DLT-V6210
connector panel).
3. Tightening the nut hand-tight.
1
2
3