![Advanced Poly-Packaging Ti-1000 Operation Manual Download Page 70](http://html.mh-extra.com/html/advanced-poly-packaging/ti-1000/ti-1000_operation-manual_2856148070.webp)
Tech. Insp.
APPI Inspection Items: Initials Initials
IF Board Tested : Passed
PS Board Tested: Passed
PLC Board Tested: Passed
Electronics:
Board connections grounded, secure
Electronics:
Wiring connectors securely fastened
Electronics:
EEPROM/Program installation/test
Mech Assembly:
Valves/Cylinders, no leaking air
Mech Assembly:
Tracking, compression/alignment adj.
Mech Assembly:
Belts, tension adj.
Mech Assembly:
Screws & fasteners secured, no loose mech components
Mech Assembly:
Roller Spin Freely
Mech Assembly:
All fasteners secured tightly
Mech Assembly:
Print head, rear nip rollers adjusted
Total hours run/tested: _________________________
Total cycles printed: ___________________________
Note: To receive a copy of the completed checklist, contact an APPI sales representative.
Summary of Contents for Ti-1000
Page 2: ...This page intentionally left blank ...
Page 8: ...This page intentionally left blank ...
Page 10: ...This page intentionally left blank ...
Page 18: ...This page intentionally left blank ...
Page 21: ......
Page 26: ...This page intentionally left blank ...
Page 40: ...This page intentionally left blank ...
Page 64: ...7 3 Trouble Shooting Checklist Error Messages Error Message Possible Cause Action ...
Page 66: ...Changing Parameters ...