![Advanced Poly-Packaging Ti-1000 Operation Manual Download Page 50](http://html.mh-extra.com/html/advanced-poly-packaging/ti-1000/ti-1000_operation-manual_2856148050.webp)
6.6 Preventative Maintenance Checklist
ITEM DESCRIPTION
PERIOD
Air regulator
Adjust pressure from 40 to 60 PSI (dependent upon print
quality)
D
Rubber rollers
Clean with alcohol (clean cloth rag), daily or after each
ribbon roll change (more often in dirty environmental
conditions
D
Print head
Clean with alcohol (cotton Q-tip), daily or after each
ribbon roll change (more often in dirty environmental
conditions
D
Aluminum rollers
Clean with alcohol
D
Wiring / Connectors
Inspect for loose wiring / connectors, tighten as needed
M
Air lines / Valves /
Cylinders
Inspect for loose air lines, listen for leaks, tighten or
replace poly tubing as needed
M
Compartments / Covers
Remove all covers, clean and blow out compartments
with
compressed air to remove dust and dirt
M
Side-plates
Clean and wipe down with lightweight oil (based upon
environmental - humidity conditions)
M
Drive belts
Inspect for wear / fraying, replace if needed
M
Gears
Inspect for particulate matter and remove if necessary.
M
!
CAUTION: Unplug power cord and disconnect air line prior to removing guards or print head.
Failure to do so may result in electronic failure.
Preventative Maintenance must be performed by qualified maintenance personnel.
Summary of Contents for Ti-1000
Page 2: ...This page intentionally left blank ...
Page 8: ...This page intentionally left blank ...
Page 10: ...This page intentionally left blank ...
Page 18: ...This page intentionally left blank ...
Page 21: ......
Page 26: ...This page intentionally left blank ...
Page 40: ...This page intentionally left blank ...
Page 64: ...7 3 Trouble Shooting Checklist Error Messages Error Message Possible Cause Action ...
Page 66: ...Changing Parameters ...