• Go to the
Twin Status Page
to observe operational state and failure statistics.
• e monitoring application on each router is now ready to be commissioned. Repeat the
following steps for each router.
• Drag a new device shape onto the LonMaker drawing. e device should be attached to the
channel on the LON side of the GR3 router. Setup and commission this device. Use the SRV
App to send a service pin for the monitoring application.
• Drag a new functional block onto the lonmaker drawing and associate it with the newly
created device. e status and alarming network variables are now ready to be bound.
e sequence of dialog boxes you will encounter is given below.
LonMaker New Device Dialog
-64-
Summary of Contents for GRouter3
Page 1: ...GRouter3 Single Port 709 1 852 Router User Guide 3 03 2007 02 10...
Page 13: ...Fig 1 8 Unicast Fig 1 9 Mulitcast 13...
Page 22: ...Fig 1 14 Power port detail e le most pin of the rightmost connector is chassis ground 22...
Page 56: ...Fig 2 23 Contacts Page 56...
Page 60: ...Fig 3 2 Initial LonMaker Drawing Fig 3 3 Router Channel Setup 60...
Page 66: ...Fig 3 9 New Virtual Functional Device Dialog Fig 3 10 Functional Blocks NV Shapes Dialog 66...