EVO S
, Installation, Commisioning and Servicing Instructions
EN
50
• The geometry of the electrodes, the absence of
alumina deposit, the appearance of the ceramic
and the seals must be checked. If the electrodes
and gaskets are damaged, replace them.
• Clean the siphon and check the correct flow of
condensates through it. The siphon must be filled
with water after maintenance.
• Install the burner door and tighten the M6 nuts
in rotation (four nuts on 40 to 70 kW models,
six nuts on 80 to 150 kW models). Maximum
tightening torque: 5 Nm.
• Connect the gas supply.
• Check that the gas circuit is sealed with a
foaming product.
• Install the control panel.
• Switch on the electric power supply.
• Start the boiler, check that the burner door is
properly sealed and check the combustion. The
rate of CO2 must comply with the values in the
table in paragraph 4.5.
• Install the front panel and check the combustion
with the door closed.
Figure 21 - Side view of the burner
Figure 22 - Position of the burner electrodes
View per A
Figure 23 - Geometry of the electrodes
40 to 70 kW 80 to 150 kW
Rating A (mm)
10
8
Rating B (mm)
Not applicable
10
Rating C (mm)
4,5
5,0
A
Summary of Contents for EVO S 100
Page 2: ......
Page 13: ... EVO S Installation Commisioning and Servicing Instructions 13 EN ...
Page 44: ...EVO S Installation Commisioning and Servicing Instructions EN 44 Figure 19 Wiring diagram ...
Page 45: ...EVO S Installation Commisioning and Servicing Instructions 45 EN ...
Page 149: ...EVO S Installation Commisioning and Servicing Instructions 149 EN ...
Page 150: ...EVO S Installation Commisioning and Servicing Instructions EN 150 ...
Page 151: ...EVO S Installation Commisioning and Servicing Instructions 151 EN ...
Page 152: ...EVO S Installation Commisioning and Servicing Instructions EN 152 ...
Page 153: ...EVO S Installation Commisioning and Servicing Instructions 153 EN ...