
EVO S
, Installation, Commisioning and Servicing Instructions
85
EN
Diagram: EVO S-10
page 2 / 7
D. OPERATING DESCRIPTION
The existing regulation controls all the circuits of the installation. It determines the outlet set
point temperature that the installation requires and sends it to the boilers, either in a 0 - 10V
signal directly to the NAVISTEM B3100 that is the master of the cascade, or over the LPB bus
or Modbus to each NAVISTEM B3100.
The cascade of boilers is controlled by the installation’s regulation system according to the
needs.
The setpoint sent reflects the heating temperature that the installation needs at this precise
moment.
E. CUSTOMER'S ELECTRICAL CONNECTION
Boiler 1
LPB
0-10V
{
Secondary probe
cascade cylinder (B10)
GND
IN
GND
IN
GND
IN
GND
IN
GND
PWM
GND
+10V
{
{
{
Order by
Modbus bus
Communication between boilers
Order by LPB bus
Pump control
boiler
Control by 0...10V
signal
{
{
Next boiler
Summary of Contents for EVO S 100
Page 2: ......
Page 13: ... EVO S Installation Commisioning and Servicing Instructions 13 EN ...
Page 44: ...EVO S Installation Commisioning and Servicing Instructions EN 44 Figure 19 Wiring diagram ...
Page 45: ...EVO S Installation Commisioning and Servicing Instructions 45 EN ...
Page 149: ...EVO S Installation Commisioning and Servicing Instructions 149 EN ...
Page 150: ...EVO S Installation Commisioning and Servicing Instructions EN 150 ...
Page 151: ...EVO S Installation Commisioning and Servicing Instructions 151 EN ...
Page 152: ...EVO S Installation Commisioning and Servicing Instructions EN 152 ...
Page 153: ...EVO S Installation Commisioning and Servicing Instructions 153 EN ...