6. CHECKS AFTER COMMISSIONING
6.1. Condensate removal
Check that the removal of condensate is not obstructed, on both the boiler side
and the pipe side.
6.2. Gas supply
Check that the gas pipe diameter is correctly sized:
It is necessary to stop all the boilers together abruptly using the boiler room
main circuit breaker to check that the gas pressure regulator safety device is
not triggered.
If this is triggered, the gas pipe is undersized. After this operation, reengage the
circuit breaker. The boilers must start automatically, if not, consult the supplier
of the gas pressure regulator.
Summary of Contents for EVO S 100
Page 2: ......
Page 13: ... EVO S Installation Commisioning and Servicing Instructions 13 EN ...
Page 44: ...EVO S Installation Commisioning and Servicing Instructions EN 44 Figure 19 Wiring diagram ...
Page 45: ...EVO S Installation Commisioning and Servicing Instructions 45 EN ...
Page 149: ...EVO S Installation Commisioning and Servicing Instructions 149 EN ...
Page 150: ...EVO S Installation Commisioning and Servicing Instructions EN 150 ...
Page 151: ...EVO S Installation Commisioning and Servicing Instructions 151 EN ...
Page 152: ...EVO S Installation Commisioning and Servicing Instructions EN 152 ...
Page 153: ...EVO S Installation Commisioning and Servicing Instructions 153 EN ...