EVO S
, Installation, Commisioning and Servicing Instructions
EN
80
Diagrams: EVO S-20
page 4 / 4
D. SPECIFIC START-UP PROCEDURE
"
Correctly install and connect the electrical connections.
"
Make the settings below in "specialist" mode
:
Line No. Value
• Time and date
menu
Set the time
Hour / minute (1)
HH.MM
Set the date
Day / month (2)
DD.MM
Set the year
Year (3)
YYYY
•
Configuration
menu
Configure the secondary flow sensor
BX2 sensor input (5931)
B10 line output sensor
Start up heating circuit 1
Heating circuit 1 (5710)
Start
Configure the alarm output
Relay output QX1 (5890)
Alarm circuit K10
Configure the direct circuit pump Q2
Relay output QX3 (5892)
Pump CC1 Q2
Save the sensors so that they are taken
into account by the system
Save sensor (6200)
Yes (switches back to
no automatically)
• Heating circuit 1 menu
Adjust the comfort setting
Comfort setting temperature (710)
---°C
Adjust the curve slope
Curve slope (720)
---
Adjust the min. flow temperature for
heating circuit 1
Minimum flow temperature setpoint
(740)
60°C (adjust according
to the lower limit)
Switch the heating regime to permanent comfort
Refer to the “ELECTRICAL VALIDATION” chapter for the regulator input/output tests
Refer to the "OPTIMISATION" chapter for configuring the time slots for the heating and DHW circuits
as well as for programming the anti-legionella cycles.
OK
OK
Short press
Press for 3 seconds
End user
Start-up
Specialist
OEM
Summary of Contents for EVO S 100
Page 2: ......
Page 13: ... EVO S Installation Commisioning and Servicing Instructions 13 EN ...
Page 44: ...EVO S Installation Commisioning and Servicing Instructions EN 44 Figure 19 Wiring diagram ...
Page 45: ...EVO S Installation Commisioning and Servicing Instructions 45 EN ...
Page 149: ...EVO S Installation Commisioning and Servicing Instructions 149 EN ...
Page 150: ...EVO S Installation Commisioning and Servicing Instructions EN 150 ...
Page 151: ...EVO S Installation Commisioning and Servicing Instructions 151 EN ...
Page 152: ...EVO S Installation Commisioning and Servicing Instructions EN 152 ...
Page 153: ...EVO S Installation Commisioning and Servicing Instructions 153 EN ...