Installation and Operation Manual
Chapter
2 Installation and Setup
ACE-3105, ACE-3205 Ver. 5.2
Connecting to PDH Equipment
2-3
Interface Cables
Refer to the following table to determine what cables and connectors are
required for installation.
specifies the wiring of all connector pinouts.
Table
2-1. Required Interface Cables
Interface
Cable Type
Terminal Control
DB-9 to DB-9, RS-232/V.24 compliant cable for
ASCII-based terminal control
SHDSL
Standard straight UTP cables terminated with RJ-45
connectors
ADSL2
+
Standard straight UTP cables terminated with RJ-45
connectors
Ethernet
•
Electrical: Cat. 5, RJ-45 to RJ-45, IEEE 802.3 compliant
cable
•
Fiber optic: Fiber optic cable that matches the
ordered interface type. For more information, see
2.4
Connecting to PDH Equipment
The PDH interfaces allow traffic be received/transmitted over E1/T1 circuit lines.
The unit's balanced E1, T1 and J1 interfaces terminate in RJ-45 connectors
designated E1 or T1. An unbalanced E1 interface is provided via the
CBL-RJ45/2BNC/E1/X adapter cable (see
Appendix A
for the cable wiring diagram).
³
To connect the balanced E1 or T1 interface:
•
Connect the E1 or T1 line to the RJ-45 connector designated E1 or T1.
Figure
2-1. ACE-3105 - E1/T1 Ports
Figure
2-2. ACE-3205 - E1/T1 Ports