37
1
I, II and 0 leds
Lamp
test
l
ON
Off
load
test
ll
ON
Auto
Alarm reset
On
load
test
Bypass
time
delay
O
OFF
Manual
retransfer
Auto
config
Priority
In-phase
monitor
AUTO
!
S1
S2
LOAD
ll
O
l
Lamp
test
l
ON
Off
load
test
ll
ON
Auto
Alarm reset
On
load
test
Bypass
time
delay
Generator
stop delay
4 min
30 s
0
1
2
3
4
5
10
15
20
30
S1 Failure
delay [s]
S1 Return
delay [min]
O Position
delay
4 s
0 s
O
OFF
Manual
retransfer
Auto
config
Priority
In-phase
monitor
AUTO
!
S1
S2
LOAD
ll
O
l
Lamp
test
l
ON
Off
load
test
ll
ON
Auto
Alarm reset
On
load
test
Bypass
time
delay
4 min
30 s
0
1
2
3
4
5
10
15
20
30
S1 Failure
delay [s]
S1 Return
delay [min]
4 s
0 s
O
OFF
Manual
retransfer
On
Priority
No priority
In-phase
monitor
On
AUTO
!
S1
S2
LOAD
ll
O
l
ON, fixed light
nnnn
Switch position is indicated with fixed
light in I, O or II led. Only one can be on
simultaneously
Flash/1 s, 50%/50 %
n
n
Delay ongoing. Going to move away from
the blinking status
Load led
ON
Off
load
test
ll
ON
Auto
Alarm reset
On
load
test
Bypass
time
delay
Generator
stop delay
4 min
30 s
4
5
10
15
20
30
S1 Return
delay [min]
O Position
delay
4 s
0 s
O
OFF
Dropout ΔU / Δf
Manual
retransfer
ΔU 5% / Δf 5%
On
Off
Priority
No priority
Source 1
In-phase
monitor
Off
On
AUTO
!
S1
S2
l
ll
O
LOAD
ON
nnnn
Supply ok and connected to load
OFF
nnnn
Not connected to load
Auto led
ll
ON
Auto
Alarm reset
Bypass
time
delay
!
S2
AUTO
ON, fixed light
nnnn
Switch is in automatic mode
Flash/1 s, 50%/50 %
n
n
Test on load
Flash/1 s, 90%/10 %
nn
n
Test off load
5 flashes/1 s, 50%/50 %
Autoconfig completed
Alarm led
ON
Off
load
test
ll
ON
Auto
Alarm reset
On
load
test
Bypass
time
delay
4 min
5
15
30
4 s
O
OFF
Manual
retransfer
On
Off
Priority
No priority
Source 1
AUTO
S2
!
OFF
nnnn
No alarms
ON, fixed light
nnnn
Handle attached, locked, other alarm
2 quick flashes/1s
nn
nn
n
nn
Control Alarm
5 flashes/1 s, 50%/50%
Auto configuration ongoing
Flash/1 s, 50%/50%
n
n
Control Retry
Flash/1 s, 10%/90%
n
nn
Auto mode off
Table 3.1 LED functionality
Summary of Contents for Zenith ZTG 30
Page 2: ......
Page 6: ...6 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE 1 ...
Page 10: ...10 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE 1 ...
Page 52: ...52 1 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...
Page 91: ...91 1 Fig 7 3 ZTGD delayed transition circuit diagram ...
Page 93: ...93 1 Figure A Figure B ...
Page 94: ...94 1 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE Figure C ...
Page 96: ...2 96 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...
Page 108: ...2 108 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...
Page 114: ...2 114 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...