28
1
Ze nit h Z TG S e r i e s AT S ,
O PER AT I O N , M A I N T EN A N C E , A N D I N S TA L L AT I O N G U I D E
The switching to available source can be
summarized in the following steps:
• An anomaly occurs on SOURCE 1
• Override momentary S1 outage delay
• Transfer from S1 to S2 delay
• Pre-transfer signal on
• Pre-transfer S1 to S2 delay
• Transfer switch (SOURCE 1) to
position O
• Center-off delay (only with Delayed
transition I - O - II type)
• Transfer switch (SOURCE 2) to
position II
• Post-transfer S1 to S2 delay
• Pre-transfer signal off
When an anomaly occurs in the source in-
use, the re-transfer to available source
can be summarized in the following steps:
• SOURCE 1 is restored
• An anomaly occurs on the SOURCE 2
• Transfer from S2 to S1 delay
• Pre-transfer signal on
• Pre-transfer S2 to S1 delay
• Transfer switch (SOURCE 2) to
position O
• Center-off delay (only with Delayed
transition I - O - II type)
• Transfer switch (SOURCE 1) to
position I
• Post-transfer S2 to S1 delay
• Pre-transfer signal off
2.5.1.3 No Source Priority (Generator
and load shed usage disabled)
Summary of Contents for Zenith ZTG 30
Page 2: ......
Page 6: ...6 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE 1 ...
Page 10: ...10 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE 1 ...
Page 52: ...52 1 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...
Page 91: ...91 1 Fig 7 3 ZTGD delayed transition circuit diagram ...
Page 93: ...93 1 Figure A Figure B ...
Page 94: ...94 1 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE Figure C ...
Page 96: ...2 96 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...
Page 108: ...2 108 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...
Page 114: ...2 114 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...