ABB | SACE Emax 2
Mechanical accessories | 5 - Operating mode for E1.2
279 | © 2017 ABB | 1SDH001330R0002 - ECN000058721 Rev. A
Circuit breaker racking-in/
racking-out operations
The following is the procedure for the insertion of the moving part in the fixed part:
WARNING!
•
Make sure the circuit-breaker is disconnected from all sources of energy.
•
Switch the circuit-breaker to the open position with springs discharged.
WARNING! Before proceeding, remove all equipment used during the work and remove
processing waste and materials used.
1. Make sure that signalling device on the fixed part indicates the
DISCONNECT
position. See Figure
Figure 79
2. Position the moving part in the fixed part and push until it comes to a stop. See Figure 80 and Figure
Figure 80
Figure 81
3. Extract the disconnection crank from its housing See Figure 82.
4. Press the lock pushbutton and insert the crank in the moving part. In this phase the moving part is still
in
DISCONNECT
position. See Figure 83.
Figure 82
2
1
Figure 83
Continued on the next page
Summary of Contents for SACE Emax E1.2
Page 2: ...ABB SACE Emax 2 2 2017 ABB 1SDH001330R0002 ECN000058721 Rev A ...
Page 8: ...VI 2017 ABB SACE Emax 2 1SDH001330R0002 ECN000058721 Rev A ...
Page 9: ...ABB SACE Emax 2 3 2017 ABB 1SDH001330R0002 ECN000058721 Rev A ...
Page 310: ...ABB SACE Emax 2 304 2017 ABB 1SDH001330R0002 ECN000058721 Rev A Service 1 Power Care ...