ABB | SACE Emax 2
Electronic accessories | 10 - Ekip Com Modbus TCP modules
221 | © 2017 ABB | 1SDH001330R0002 - ECN000058721 Rev. A
Continued from the previous page
Further details are given in document
Interface for Emax 2), sections Status Global 1 [dlog], Status Accessories 1 and
Status Accessories 2.
The modules are always supplied with Ekip AUP and Ekip RTC contacts (see the chapter "16 - Other
accessories" on page 244).
Compatibility and power supply
The modules can be installed combined with Ekip Touch, Hi-Touch, G Touch, and G Hi-Touch trip units, and
require the presence of an Ekip Supply module in the first slot of the circuit-breaker terminal box.
Connections
The modules must be mounted on the terminal box of the circuit-breaker or of the fixed part of the withdrawable
circuit-breaker, in the first free slot after the Ekip Supply module.
Information on the assembly is available on the website http://www.abb.com/abblibrary/DownloadCenter/, in
particular in the kit sheet
.
An example with an E2.2 circuit-breaker in fixed and withdrawable versions is provided to the side.
The following is a view of the terminal box of E1.2 and E2.2/E4.2/E6.2 circuit-breakers with the relevant wiring
diagram:
R2
R1
U2
U1
38
36
35
98
96
95
YR
M
S33
S51
YO
EKIP Supply
Trip Unit I/O
Ge-
Ge
Szc
K2
K1
W4
W3
Q4
Q3
Q2
Q1
YC
YU
YO2
RTC
I/O
TU
44
42
41
34
32
31
24
22
21
14
12
11
C12
C13
C11
C2
C3
C1
D2
D1
48
46
45
Ne
Rca
Ne-
Gzi
Szo
Szi
Gzo
Rct
Vn
V1
V2
V3
Module
Module
YO
01
H4
02
K5
04
K10
K9
94
92
H3
91
81
H2
82
K4
K8
84
74
K7
K3
H1
72
71
61
HC
62
64
54
52
51
EKIP Supply
Module
Trip Unit I/O
HC
K6
Ge-
Ge
Szc
K2
K1
W4
W3
R2
R1
Q4
Q3
Q2
Q1
YC2
YC
YU
YO2
RTC
I/O
TU
44
42
41
34
32
31
24
22
21
14
12
11
C22
C21
C12
C13
C11
C2
C3
C1
D2
D1
48
46
45
Ne
Rca
Ne-
Gzi
Szo
Szi
Gzo
Rct
Vn
V1
V2
V3
U2
U1
38
36
35
98
96
95
YR
M
S33
S51
EKIP Signalling 4K
Q5..Q10
Module
Module
HC
A4
A3
A4
52
194
XK7
XK7
1
2
193
S75I/5
W9
RJ45
BUS 1
Eki
pCo
m
Modbus
TC
P
n
COM
K51
O)
*
* L)
* L)
n
Eki
pC
om Redundan
t
Modbus TC
P
BUS 2
RJ45
W9R
62
K51
COM
R)
*
R)
*
Diagrams 52 - 62
Continued on the next page
Summary of Contents for SACE Emax E1.2
Page 2: ...ABB SACE Emax 2 2 2017 ABB 1SDH001330R0002 ECN000058721 Rev A ...
Page 8: ...VI 2017 ABB SACE Emax 2 1SDH001330R0002 ECN000058721 Rev A ...
Page 9: ...ABB SACE Emax 2 3 2017 ABB 1SDH001330R0002 ECN000058721 Rev A ...
Page 310: ...ABB SACE Emax 2 304 2017 ABB 1SDH001330R0002 ECN000058721 Rev A Service 1 Power Care ...