4.
Review the setting for
CircCurrBk
to confirm whether a circulating current limit
will result in an
Alarm
state,
Auto Block
or
Auto&Man Block
of the automatic
voltage control for tap changer, for parallel control function TR8ATCC.
5.
Inject a voltage U
B
equal to
USet
for each transformer.
6.
Inject a load current for Transformer 1 that is equal to rated load current
I2Base
and a load current for Transformer 2 that is 1% less than (
I2Base
– (
I2Base
·
CircCurrLimit))
7.
Confirm that the automatic voltage control for tap changer, for parallel control
function TR8ATCC responds in accordance with the setting for
CircCurrBk
.
Alarm and blocking conditions can be confirmed through interrogation of the
event menu or the control menu on the local HMI.
VTmismatch during parallel operation
1.
Confirm that
OperationPAR
is set to
MF
for each transformer in the parallel
group.
2.
Review the setting for
VTmismatch
and
tVTmismatch
.
3.
Inject a voltage U
B
equal to
USet
for Transformer 1 and a voltage less than (
USet
– (
VTmismatch
·
USet
)) for Transformer 2.
4.
This condition should result in a
VTmismatch
which will mutually block the
operation of the automatic voltage control for tap changer, parallel control
function TR8ATCC for all transformers connected in the parallel group, which
can be confirmed through interrogation of the local HMI.
5.
Confirm that the automatic voltage control for tap changer, parallel control
function TR8ATCC responds in accordance with the setting for
CircCurrBk
.
12.10.3.9
Completing the test
Continue to test another function or end the test by changing the
TestMode
setting to
Off
. Restore connections and settings to their original values, if they were changed for
testing purposes.
12.10.4
Single command, 16 signals SINGLECMD
For the single command function block, it is necessary to configure the output signal
to corresponding binary output of the IED. The operation of the single command
function (SINGLECMD) is then checked from the local HMI by applying the
commands with
Mode
=
Off
,
Steady
or
Pulse
, and by observing the logic statuses of
the corresponding binary output. Command control functions included in the
operation of different built-in functions must be tested at the same time as their
corresponding functions.
12.10.5
Interlocking
Prepare the IED for verification of settings outlined in section
section
Section 12
1MRK502053-UEN B
Testing functionality by secondary injection
222
Generator protection REG670 2.0 IEC
Commissioning manual
Summary of Contents for REG670 2.0 IEC
Page 1: ...Relion 670 series Generator protection REG670 2 0 IEC Commissioning manual ...
Page 2: ......
Page 16: ...10 ...
Page 30: ...24 ...
Page 58: ...52 ...
Page 62: ...56 ...
Page 76: ...70 ...
Page 90: ...84 ...
Page 94: ...88 ...
Page 108: ...102 ...
Page 246: ...240 ...
Page 252: ...246 ...
Page 267: ...261 ...