After completion of the calibration step
•
Before leaving the ICT Tool
6.7
Auditing
During installations, calibrations and commissions the ICT generates reports for each
of the steps and collects them under the Auditing tab. See the procedures below on
how to view and delete reports as well as generate logs from reports.
1.
To view the reports, go to the
Auditing
tab.
IEC11000049-1-en.vsd
GUID-8348F60B-9BF5-4018-9740-0FA3371B0F9F V1 EN
Figure 16:
Auditing tab
2.
Open and view each report.
3.
View reports in one of the following ways:
•
In the short cut menu, right click and select
View report
.
•
Click the
View report
button in the upper right corner of the auditing
screen.
•
Double click a report record.
4.
Delete reports in one of the following ways:
•
In the short cut menu, right click and select
Delete report
.
•
Click the
Delete report
button in the upper right corner of the auditing
screen.
•
Select a record with the mouse cursor then press the Delete key on the
keyboard.
5.
Generate logs in one of the following ways:
Section 6
1MRK502053-UEN B
Calibrating injection based sensitive rotor earth fault protection
66
Generator protection REG670 2.0 IEC
Commissioning manual
Summary of Contents for REG670 2.0 IEC
Page 1: ...Relion 670 series Generator protection REG670 2 0 IEC Commissioning manual ...
Page 2: ......
Page 16: ...10 ...
Page 30: ...24 ...
Page 58: ...52 ...
Page 62: ...56 ...
Page 76: ...70 ...
Page 90: ...84 ...
Page 94: ...88 ...
Page 108: ...102 ...
Page 246: ...240 ...
Page 252: ...246 ...
Page 267: ...261 ...