The IED will restart after confirmation. Menu items
LANAB:1
and
LANCD:1
are hidden in local HMI after restart but are visible in PST
where the values for parameter
Mode
is set to
Duo
.
10.3
Verifying the communication
To verify that the communication is working a test/analyzing tool, for example
ITT600, can be used.
Verifying redundant IEC 61850-8-1 communication
Ensure that the IED receives IEC 61850-8-1 data on both port AB and CD. Browse in
the local HMI to
Main menu/Diagnostics/Communication/Redundant PRP
and
check that both signals LAN-A-STATUS and LAN-B-STATUS are shown as
Ok
.
Remove the optical connection to one of the ports AB or CD. Verify that either signal
LAN-A-STATUS or LAN-B-STATUS (depending on which connection that was
removed) are shown as
Error
and the that other signal is shown as
Ok
. Be sure to re-
connect the removed connection after completed verification.
Section 10
1MRK502053-UEN B
Establishing connection and verifying the IEC 61850 communication
94
Generator protection REG670 2.0 IEC
Commissioning manual
Summary of Contents for REG670 2.0 IEC
Page 1: ...Relion 670 series Generator protection REG670 2 0 IEC Commissioning manual ...
Page 2: ......
Page 16: ...10 ...
Page 30: ...24 ...
Page 58: ...52 ...
Page 62: ...56 ...
Page 76: ...70 ...
Page 90: ...84 ...
Page 94: ...88 ...
Page 108: ...102 ...
Page 246: ...240 ...
Page 252: ...246 ...
Page 267: ...261 ...