which depends on the configuration. Ensure that the logical status of the BLOCK
input signal is equal to 0 for the function to be tested. Event function blocks can also
be individually blocked to ensure that no events are reported to a remote station during
the test. This is done by setting the parameter
EvDisable
to
Yes
.
Any function is blocked if the corresponding setting in the local HMI
under
Main menu/Test/Function test modes
menu remains
On
, that
is, the parameter
Blocked
is set to
Yes
and the parameter
TESTMODE
under
Main menu/Test/IED test mode
remains active. All functions
that were blocked or released in a previous test mode session, that is,
the parameter
Test mode
is set to
On
, are reset when a new test mode
session is started.
Procedure
1.
Click the
Function test modes
menu.
The Function test modes menu is located in the local HMI under
Main menu/
Test/Function test modes
.
2.
Browse to the function instance that needs to be released.
3.
Set parameter
Blocked
for the selected function to
No
.
11.6
Verifying analog primary and secondary
measurement
Verify that the connections are correct and that measuring and scaling is done
correctly. This is done by injecting current and voltage to the IED.
Apply input signals as needed according to the actual hardware and
the application configuration.
1.
Inject a symmetrical three-phase voltage and current at rated value.
2.
Compare the injected value with the measured values.
The voltage and current phasor menu in the local HMI is located under
Main
menu/Measurements/Analog primary values
and
Main menu/
Measurements/Analog secondary values
.
3.
Compare the frequency reading with the set frequency and the direction of the
power.
The frequency and active power are located under
Main menu/Measurements/
Monitoring/ServiceValues(MMXN)/CVMMXN:x
. Then navigate to the
bottom of the list to find the frequency.
4.
Inject an unsymmetrical three-phase voltage and current, to verify that phases
are correctly connected.
Section 11
1MRK502053-UEN B
Testing IED operation
100
Generator protection REG670 2.0 IEC
Commissioning manual
Summary of Contents for REG670 2.0 IEC
Page 1: ...Relion 670 series Generator protection REG670 2 0 IEC Commissioning manual ...
Page 2: ......
Page 16: ...10 ...
Page 30: ...24 ...
Page 58: ...52 ...
Page 62: ...56 ...
Page 76: ...70 ...
Page 90: ...84 ...
Page 94: ...88 ...
Page 108: ...102 ...
Page 246: ...240 ...
Page 252: ...246 ...
Page 267: ...261 ...