Test point
Reach
Value
Comments
10
X
0.17 x (2 x X1
set
+ X0
set
)
Exact: 0.5 x (2 x X1
set
X0
set
)/3
R
-0.36 x (2 x X1
set
+ X0
set
)
Exact: 0.5 x (2X1
set
+ X0
set
)/(3 x
tan(AgNegDir=30°)
11
X
0.27 x (2 x X1
set
+X0
set
)
Exact: 0.8 x (2 x X1
set
+ X0
set
)/3
R
–0.57 x (2 x X1
set
+ X0
set
)
Exact: 0.8 x ( X0set)/(3 x
tan(AgNegDir=30°)
12
X
0.5 x (2 x X1
set
+ X0
set
)/3
R
0.5 x (2 x R1
set
+ R0
set
)/3
13
X
0
R
RFPE
12.4.3.1
Measuring the operating limit of set values in cases without shaped
load encroachment characteristics (OperationLdCmp=off)
Procedure for phase-to-phase fault L1–L2.
1.
Subject the IED to healthy normal load conditions for at least two seconds.
2.
Apply the fault condition and slowly decrease the measured impedance to find
the operating value of the phase-to-phase fault for zone 1 according to test point
1 in figure
and table
. Compare the result of the measurement with the set
value.
3.
to find the operating value for test point 2, 3 in table
the operating value for the phase-to-earth loop according to test point 1, 2, 3 in
table
Observe that the zones that are not tested have to be blocked and the zone that is
tested has to be released.
4.
Repeat steps
to find the operating value for the phase-to-earth fault L3-E
according to figure
and table
Test points 8 and 9 are intended to test the directional lines of
impedance protection. Since directionality is a common
function for all 5 measuring zones, it is only necessary to test
points 6, 7, 8 and 9 once, in the forward direction (the largest
reverse zone can be used to facilitate the test) in order to test the
accuracy of directionality (directional angles). Directional
functionality testing (trip inside, no-trip outside) should always
be carried for all impedance zones set with directionality
(forward or reverse).
12.4.3.2
Measuring the operate time of distance protection zones
Section 12
1MRK502053-UEN B
Testing functionality by secondary injection
118
Generator protection REG670 2.0 IEC
Commissioning manual
Summary of Contents for REG670 2.0 IEC
Page 1: ...Relion 670 series Generator protection REG670 2 0 IEC Commissioning manual ...
Page 2: ......
Page 16: ...10 ...
Page 30: ...24 ...
Page 58: ...52 ...
Page 62: ...56 ...
Page 76: ...70 ...
Page 90: ...84 ...
Page 94: ...88 ...
Page 108: ...102 ...
Page 246: ...240 ...
Page 252: ...246 ...
Page 267: ...261 ...