12.10.3.7
Single transformer
Load drop compensation
1.
Confirm that
OperationLDC
is set to
On
.
2.
Confirm settings for
Rline
and
Xline
.
3.
Calculate the expected load voltage U
L
(displayed as a measured value on the
local HMI) based on secondary injection of transformer secondary voltage (U
B
=
USet
) and rated load current (I
L
=
I1Base
), in accordance with equation
EQUATION2080 V3 EN
(Equation 115)
where:
U
L
, I
L
= Re(I
L
) + jlm(I
L
) are complex phase quantities
When all secondary phase-to-earth voltages are available, use the positive-
sequence components of voltage and current. By separation of real and
imaginary parts:
,
,
,
,
ul re ub re rline il re xline il im
=
-
×
+
×
EQUATION2082 V1 EN
(Equation 116)
,
,
,
,
ul im ub im xline il re rline il im
=
-
×
-
×
EQUATION2084 V1 EN
(Equation 117)
where:
ub
is the complex value of the busbar voltage
il
is the complex value of the line current (secondary side)
rline
is the value of the line resistance
xline
is the value of the line reactance
For comparison with the set-point value, the modulus of U
L
are according to
.
¦ U
L
¦ = (ul , re)
2
+ (ul , im)
2
EQUATION2086 V2 EN
(Equation 118)
4.
Inject voltage for U
B
equal to setting
USet
.
5.
Inject current equal to rated current
I2Base
.
6.
Confirm on the local HMI that service values for bus voltage and load current are
equal to injected quantities.
1MRK502053-UEN B
Section 12
Testing functionality by secondary injection
Generator protection REG670 2.0 IEC
217
Commissioning manual
Summary of Contents for REG670 2.0 IEC
Page 1: ...Relion 670 series Generator protection REG670 2 0 IEC Commissioning manual ...
Page 2: ......
Page 16: ...10 ...
Page 30: ...24 ...
Page 58: ...52 ...
Page 62: ...56 ...
Page 76: ...70 ...
Page 90: ...84 ...
Page 94: ...88 ...
Page 108: ...102 ...
Page 246: ...240 ...
Page 252: ...246 ...
Page 267: ...261 ...