Note/Illustration
Action
Check the rails alignment according to
alignment in different directions on page 133
.
8
Release the carriage brake and push the carriage
manually along.
If the linear rails are correctly aligned, you should
sense no " step " while passing the rail junction
points. When the alignment is correct, tighten the
screws one by one, after applying Loctite 243 on
its thread.
Use a brush to lubricate the linear rails.
9
Re-assemble all the cover support brackets and
covers, if necessary.
10
138
Product manual - IRT 710
3HKA00000186299-001 Revision: B
© Copyright 2023 ABB. All rights reserved.
3 Installation and commissioning
3.4.7.3 Geometric alignment of track motion IRT 710
Continued
Summary of Contents for IRT 710
Page 1: ...ROBOTICS Product manual IRT 710 ...
Page 14: ...This page is intentionally left blank ...
Page 58: ...This page is intentionally left blank ...
Page 84: ...This page is intentionally left blank ...
Page 360: ...This page is intentionally left blank ...
Page 364: ...This page is intentionally left blank ...
Page 378: ...This page is intentionally left blank ...
Page 380: ...This page is intentionally left blank ...
Page 383: ......