Picture
Specific IRT 710 tools
Qty
xx2200001172
Levelling tool (3HAW107700360)
1
xx2200001189
Tool for levelling screw nut tightening
(3HAW060012015)
1
Assembling procedure
The following table describes all necessary steps to achieve a correct assembly
of the IRT 710 track:
Note/Illustration
Action
Markup on a clean floor for the IRT 710.
1
Markup also the position of each cross member.
Position the preassembled carriage & track sec-
tion on the floor at the predetermined position.
2
Linearly position the other preassembled section
beside the section above.
3
Remove the gear rail and rack at the disconnec-
tion point.
4
xx2200000668
Connect the preassembled sections with screws
not mounted.
5
Continues on next page
122
Product manual - IRT 710
3HKA00000186299-001 Revision: B
© Copyright 2023 ABB. All rights reserved.
3 Installation and commissioning
3.4.7.1 Assembling the sections
Continued
Summary of Contents for IRT 710
Page 1: ...ROBOTICS Product manual IRT 710 ...
Page 14: ...This page is intentionally left blank ...
Page 58: ...This page is intentionally left blank ...
Page 84: ...This page is intentionally left blank ...
Page 360: ...This page is intentionally left blank ...
Page 364: ...This page is intentionally left blank ...
Page 378: ...This page is intentionally left blank ...
Page 380: ...This page is intentionally left blank ...
Page 383: ......