![ABB IRB 8700 Product Manual Download Page 669](http://html.mh-extra.com/html/abb/irb-8700/irb-8700_product-manual_5084669.webp)
Note
Action
Make sure that one of the M8 holes in the
gearbox, will be at twelve o'clock when
lifting the gearbox onto the guide pins.
6
Use caution and lift the gearbox onto the
guide pins.
7
Slide the gearbox on the guide pins into
mounting position.
Note
Do not secure the gearbox at this point. It
will be secured together with the motor
flange, when the motor flange is refitted.
8
Remove the lifting accessories.
9
Refitting the motor flange
Note
Action
Clean the contact surfaces on gearbox and motor
flange.
1
Clean o-ring and o-ring groove on motor flange.
2
Inspect the o-ring.
Note
Replace if damaged.
3
Continues on next page
Product manual - IRB 8700
669
3HAC052853-001 Revision: M
© Copyright 2015-2020 ABB. All rights reserved.
4 Repair
4.8.5 Replacing the axis-4 primary gearbox
Continued
Summary of Contents for IRB 8700
Page 1: ...ROBOTICS Product manual IRB 8700 ...
Page 8: ...This page is intentionally left blank ...
Page 96: ...This page is intentionally left blank ...
Page 690: ...This page is intentionally left blank ...
Page 718: ...This page is intentionally left blank ...
Page 724: ...This page is intentionally left blank ...
Page 742: ...This page is intentionally left blank ...
Page 748: ......
Page 749: ......