![ABB IRB 8700 Product Manual Download Page 390](http://html.mh-extra.com/html/abb/irb-8700/irb-8700_product-manual_5084390.webp)
Refitting the upper arm and the upper arm shafts
Note
Start the refitting of the shafts on the axis-2 side!
Note
Action
CAUTION
The upper arm complete weighs 900 kg.
All lifting accessories used must be sized
accordingly!
1
CAUTION
The shaft weighs 19 kg.
xx1500002732
Lift the upper arm into mounting position.
2
Go to the user instructions enclosed with the press tool to refit
the sealing rings, the upper arm shafts and the KM nuts.
xx0900000813
Press tools, upper arm shaft: 3HAC069154-001
User instructions, upper arm shaft press tools: 3HAC069154-
038
WARNING
Handling the tool incorrectly may cause serious injury.
Read and follow enclosed user instructions for the tool.
Refitting the cable harness in the lower arm
Note
Action
Run the cable harness up through the lower
arm.
1
Note
Make sure the cable harness is rotated one
revolution between the upper and lower
bracket inside the lower arm, when refitted.
2
Continues on next page
390
Product manual - IRB 8700
3HAC052853-001 Revision: M
© Copyright 2015-2020 ABB. All rights reserved.
4 Repair
4.5.6 Replacing the complete lower arm
Continued
Summary of Contents for IRB 8700
Page 1: ...ROBOTICS Product manual IRB 8700 ...
Page 8: ...This page is intentionally left blank ...
Page 96: ...This page is intentionally left blank ...
Page 690: ...This page is intentionally left blank ...
Page 718: ...This page is intentionally left blank ...
Page 724: ...This page is intentionally left blank ...
Page 742: ...This page is intentionally left blank ...
Page 748: ......
Page 749: ......