
2 Installation
2.6.1. Installation of Water and air unit
3HAC027309-001 Revision: D
118
©
Co
py
rig
h
t 200
6-
201
0 ABB. All righ
ts reser
v
ed.
Installation of Water and air unit, type Sb
The procedure below details how to install the Water and Air unit, type Sb on the robot base.
5. Connect the split box cable for Water and Air
unit with the split box at the Water and Air unit.
xx0600003347
Parts:
•
Split box
Action
Note
Action
Note
1.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
For Foundry Prime robots:
Do not turn off the air pressure to motors and
SMB.
2. Remove the attachment screws securing the
top cover at the base of the robot.
Keep the screws! They will be reused when
fitting the water and air unit.
3. Fit the
bracket connection box
using the
attachment screws removed earlier.
xx0800000119
Parts:
•
A: Bracket connection box
•
B: Attachment holes for
bracket left and right
•
C: Attachment holes for
connection box
•
D: Attachment holes for
securing to top cover
Continued
Continues on next page
Summary of Contents for DressPack IRB 6620
Page 1: ...ABB Robotics Product manual DressPack SpotPack IRB 6620 ...
Page 2: ......
Page 8: ......
Page 288: ......
Page 289: ......