![ABB Advant Controller 450 User Manual Download Page 437](http://html.mh-extra.com/html/abb/advant-controller-450/advant-controller-450_user-manual_3016437.webp)
Advant
®
Controller 450 User’s Guide
Section 5.5.17 Loading of Application Program
3BSE 002 415R701 Rev A
5-85
Example of Procedure
Action
Response
1.
Set the start mode selector on the
Processor Module PM511 front in 3 (CLEAR)
2.
Check that the program card is in position.
The system software will be reloaded at the
cold start.
3.
Depress the ENTER button
The controller system configuration and the
application program are erased.
The processor module will indicate P2 after
about a minute.
4.
Set the start mode selector in 1 (AUTO)
Do not press the ENTER button!
5.
Connect the communication cable between
the engineering station and the Processor
Module PM511, port X10.
6.
Switch on the power supply to the
Successful Advant Station 100 Series ES
engineering station
boot Windows start up.
7.
If necessary start Application Builder in
Appropriate node found.
AdvaBuild window to select project and
node.
8.
Start On-line Builder from within the
Booting engineering board
Application Builder or in AdvaBuild
Press <Ctrl>, <Break>
window.
9.
Press <Ctrl>, <Break>
to activate the engineering tool.
10. Select 1 (Advant Controller 400) <CR>
11.
Select 1 (Advant Controller 400 programming)
<CR>
12. In the node Setup window confirm or
Contact with target.
select the correct Target System.
Identity presented.
13. Type LDIR SRCE:*.AD<CR>to
check that your DUAP dump is available.
In the example the following
ABCD0001.AD
ABCD0002.AD etc.
are listed.
14. Type LOAP <dump name>, SRCE <CR>
The loading proceed. #
For example LOAP ABCD, SRCE<CR>
15. DICONFIG <CR>
OK TO START UP THE TARGET, Y/N
16. Type Y <CR>
After about one minute:
THE TARGET SYSTEM IS NOW IN
OPERATION MODE
The processor module will now indicate P1 (OPERATION mode) on the character display.
Summary of Contents for Advant Controller 450
Page 1: ...Advant OCS with Master software GYDQW RQWUROOHU User s Guide 3BSE 002 415R701 Rev A ...
Page 26: ...Advant Controller 450 User s Guide Table of Contents 3BSE 002 415R701 Rev A xvi ...
Page 30: ...Advant Controller 450 User s Guide Table of Contents 3BSE 002 415R701 Rev A xx ...
Page 488: ... GYDQW RQWUROOHU 8VHU V XLGH SSHQGL DUGZDUH 0RGXOHV A 48 3BSE 002 415R701 Rev A ...
Page 508: ...Advant Controller 450 User s Guide Appendix D Item Designations D 12 3BSE 002 415R701 Rev A ...
Page 518: ...Advant Controller 450 User s Guide Appendix F Load Calculation F 4 3BSE 002 415R701 Rev A ...
Page 522: ...Advant Controller 450 User s Guide Appendix G Memory Calculation G 4 3BSE 002 415R701 Rev A ...
Page 528: ...Advant Controller 450 User s Guide Appendix H Halt Codes H 6 3BSE 002 415R701 Rev A ...
Page 562: ...Advant Controller 450 User s Guide Index iv 3BSE 002 415R701 Rev A ...
Page 563: ......
Page 564: ...3BSE 002 415R701 Rev A March 2000 ...