Extension Off-line
1.
Shut down the system by setting the start mode selector on the existing processor module
in STOP position. The display shows -3.
The entire process control is shut down!
2.
Check module identities. If the existing module is withdrawn, insert again.
Keep the start mode selector in 2 (STOP) position.
3.
Check module position 2 (item designation 108, see
) for
visible damage, dust, and so on.
4.
Set start mode selector on the new processor module in 2 (STOP) position.
CAUTION
Do not forget the general rule: Reflect on the danger of ESD. Use the
grounded wristband when handling circuit boards.
5.
Insert the new module in position 2.
There are alternative ways of continued installation with respect to safety.
Steps 6 - 9
describe a normal installation.
Steps 10 - 16 describe an installation with increased safety by checking basic changeover
functionality in working mode CONFIGURATION, without affecting the process
controlled.
------------ Normal Installation --------------------
6.
Set the start mode selector on the existing processor module in 1 (AUTO) position.
Push the ENTER button. The display shows P1.
Process control starts.
7.
Set the start mode selector on the new processor module in the same position as the
existing processor module.
8.
Push the ENTER button on the new module.
Check the display. A correct installation gives the following indications in sequence:
a.
b2 (UPGRADING), b1 STANDBY) after
<
90 sec.
b.
LEDs DUAL on both processor modules light up.
9.
It is recommended that you perform a function test. Manual changeover is described in
--------------------- end ----------------------------------
--------Installation with Increased Safety------
10. Set the start mode selector on the existing processor module in 1 (AUTO) position.
11.
Connect an engineering station to the existing processor module and, after the connection
session, give the command ECONFIG. The display on the processor module front shows
P2 CONFIGURATION.
Summary of Contents for Advant Controller 450
Page 1: ...Advant OCS with Master software GYDQW RQWUROOHU User s Guide 3BSE 002 415R701 Rev A ...
Page 26: ...Advant Controller 450 User s Guide Table of Contents 3BSE 002 415R701 Rev A xvi ...
Page 30: ...Advant Controller 450 User s Guide Table of Contents 3BSE 002 415R701 Rev A xx ...
Page 488: ... GYDQW RQWUROOHU 8VHU V XLGH SSHQGL DUGZDUH 0RGXOHV A 48 3BSE 002 415R701 Rev A ...
Page 508: ...Advant Controller 450 User s Guide Appendix D Item Designations D 12 3BSE 002 415R701 Rev A ...
Page 518: ...Advant Controller 450 User s Guide Appendix F Load Calculation F 4 3BSE 002 415R701 Rev A ...
Page 522: ...Advant Controller 450 User s Guide Appendix G Memory Calculation G 4 3BSE 002 415R701 Rev A ...
Page 528: ...Advant Controller 450 User s Guide Appendix H Halt Codes H 6 3BSE 002 415R701 Rev A ...
Page 562: ...Advant Controller 450 User s Guide Index iv 3BSE 002 415R701 Rev A ...
Page 563: ......
Page 564: ...3BSE 002 415R701 Rev A March 2000 ...