![ABB Advant Controller 450 User Manual Download Page 212](http://html.mh-extra.com/html/abb/advant-controller-450/advant-controller-450_user-manual_3016212.webp)
Advant
®
Controller 450 User’s Guide
Chapter 2 Installation
2-58
3BSE 002 415R701 Rev A
You can redimension in a later stage, but it is time-consuming work. The general rule is to plan
well from the start. Always dimension the spares!
From a configuration viewpoint, not all functions to create the infrastructure of the controller
are treated in the same way. Some of them are touched by all activities illustrated in the figure
above. Some are automatically included in the controller system and need only limited data
entry. For an overview, see
, which features an outline of controller system
configuration information.
Dimensioning, creating and data entry are described in detail in separate documentation.
For a detailed description of the principles of the controller system configuration work,
the dimensioning and creation of records, and the interactive work using an engineering station,
see the manual AMPL Configuration Advant Controller 400 Series.
See
Chapter 3, Configuration/Application Building
for considerations, the maximum number of
items, and so on.
For data entry details, see the manual Data Base Element Reference Manual.
Figure 2-26. Controller System Configuration in a Broad Outline
System
definition
Application
analyses
Dimensioning
Creating
Data entry
(fill in)
system
configuration
Configuration / application building
Controller
Summary of Contents for Advant Controller 450
Page 1: ...Advant OCS with Master software GYDQW RQWUROOHU User s Guide 3BSE 002 415R701 Rev A ...
Page 26: ...Advant Controller 450 User s Guide Table of Contents 3BSE 002 415R701 Rev A xvi ...
Page 30: ...Advant Controller 450 User s Guide Table of Contents 3BSE 002 415R701 Rev A xx ...
Page 488: ... GYDQW RQWUROOHU 8VHU V XLGH SSHQGL DUGZDUH 0RGXOHV A 48 3BSE 002 415R701 Rev A ...
Page 508: ...Advant Controller 450 User s Guide Appendix D Item Designations D 12 3BSE 002 415R701 Rev A ...
Page 518: ...Advant Controller 450 User s Guide Appendix F Load Calculation F 4 3BSE 002 415R701 Rev A ...
Page 522: ...Advant Controller 450 User s Guide Appendix G Memory Calculation G 4 3BSE 002 415R701 Rev A ...
Page 528: ...Advant Controller 450 User s Guide Appendix H Halt Codes H 6 3BSE 002 415R701 Rev A ...
Page 562: ...Advant Controller 450 User s Guide Index iv 3BSE 002 415R701 Rev A ...
Page 563: ......
Page 564: ...3BSE 002 415R701 Rev A March 2000 ...