Electrical installation
55
Electrical installation
What this chapter contains
This chapter instructs in the cabling of the drive.
Warnings
WARNING!
Only qualified electricians are allowed to carry out the work described in
this chapter. Follow the
on the first pages of this manual. Ignoring
the safety instructions can cause injury or death.
Checking the insulation of the assembly
Drive
Every drive module has been tested for insulation between the main circuit and the
chassis (2500 V rms 50 Hz for 1 second) at the factory. Therefore, do not make any
voltage tolerance or insulation resistance tests (e.g. hi-pot or megger) on any part of
the drive.
Input cable
Check the insulation of the input cable according to local regulations before
connecting it to the drive.
Motor and motor cable
Check the insulation of the motor and motor cable as follows:
1. Check that the motor cable is disconnected from the drive output terminals U2,
V2 and W2.
2. Measure the insulation resistances of the motor cable and the motor between
each phase and the Protective Earth by using a measuring voltage of 1 kV DC.
The insulation resistance must be higher than 1 Mohm.
PE
ohm
M
Summary of Contents for ACS800-04
Page 4: ......
Page 12: ...Safety instructions 12 ...
Page 54: ...Planning the electrical installation 54 ...
Page 72: ...Motor control and I O board RMIO 72 ...
Page 116: ...Resistor braking 116 ...
Page 117: ......