Annual Service Cont.
• Remove the mains supply fuse in the panel, this will switch the panel over to
battery back up operation and the panel lcd should display a mains fault by the
green light goes out and the amber battery light illuminates.
• The curtains should remain open for up to two hours pending on the number of
MCB,s attached , if the curtains deploy the batteries will require changing. New
batteries should be date marked and replaced every 2 years.
• Restore the mains supply by refitting the fuse.
• The steel components if powder coated or painted can be cleaned with a clean
cloth and WD40 or T Cut, the curtain fabric should only be wiped with a dry
cloth. Under no circumstances should aggressive chemical cleaners be used.
• This is a life critical fire rated product and should be treated accordingly, its
functionality is more important than appearance.
70
Summary of Contents for Evo1-MCP 1
Page 4: ...Back to contents Mechanical Installation Instructions 4...
Page 17: ...Back to contents Control Panel Lighting 17...
Page 20: ...Back to contents Motor Control Board Lighting 20...
Page 22: ...Back to contents General Overview Instructions 22...
Page 25: ...Back to contents Control Panel Wiring 25...
Page 30: ...Back to contents Motor Control Board Wiring 30...
Page 36: ...Back to contents Dip Switch Settings 36...
Page 39: ...Back to contents Override Switch Wiring to Control Panel 39...
Page 41: ...Back to contents Override Switch Wiring to Motor Control Board 41...
Page 44: ...Back to contents Control Panel Function Programming 44...
Page 54: ...Back to contents Optional Extras 54...
Page 58: ...Wiring of Optional Extras 58...
Page 64: ...Back to contents Fault Finding 64...
Page 67: ...Back to contents Maintenance Service 67...
Page 74: ...Back to contents Standard Drawings Headbox and Guides 74...
Page 84: ...Back to contents 44 0 1204 383839 info a1shutters co uk www a1sgroup com...