• It is important to check the motor cable is correctly wired into the Motor
control board {MCB) the power+ and - terminals and the brake out + and -
Incorrect wiring will damage the motor and board.
• If the motor control board {MCB) is to be install remotely from the curtain head
box then the motor cable must be fire protected. It is recommended to install
the MCB onto the curtain head box.
• The Multi Control Panel can power upto 4 motors.
• The sequence below must be adhered prior to connecting the Control Panel to
the mains supply.
• Turn the key switch to the test position.
• Remove the main fuse in the bottom left of the board at the mains input
• Connect the mains supply cable.
• Replace the main fuse.
• The MCB will start up and go through its test sequence and the green power
light will illuminate, the panel will then start to beep and the red alarm light will
illuminate.
• Flameshield Evo 1 Curtain Control will display on the LCD screen.
• If the low battery fault is illuminated this will turn off once the mains supply is
connected and the panel charges the batteries to the required voltage.
• The MCB will illuminate
• Turn the test key to the stand by position the red alarm light will turn off and
the audible beep will stop, all curtain connected to the Control Panel will now
start to retract to the headbox.
• The dip switches must now be set.
24
Summary of Contents for Evo1-MCP 1
Page 4: ...Back to contents Mechanical Installation Instructions 4...
Page 17: ...Back to contents Control Panel Lighting 17...
Page 20: ...Back to contents Motor Control Board Lighting 20...
Page 22: ...Back to contents General Overview Instructions 22...
Page 25: ...Back to contents Control Panel Wiring 25...
Page 30: ...Back to contents Motor Control Board Wiring 30...
Page 36: ...Back to contents Dip Switch Settings 36...
Page 39: ...Back to contents Override Switch Wiring to Control Panel 39...
Page 41: ...Back to contents Override Switch Wiring to Motor Control Board 41...
Page 44: ...Back to contents Control Panel Function Programming 44...
Page 54: ...Back to contents Optional Extras 54...
Page 58: ...Wiring of Optional Extras 58...
Page 64: ...Back to contents Fault Finding 64...
Page 67: ...Back to contents Maintenance Service 67...
Page 74: ...Back to contents Standard Drawings Headbox and Guides 74...
Page 84: ...Back to contents 44 0 1204 383839 info a1shutters co uk www a1sgroup com...