background image

14

15

2VV.

 Creating innovative solutions for you and your business since 1995.

ver.1 05-10-20

IT: PRIMA DI ACCENDERE L'UNITÀ PER LA PRIMA VOLTA, CONTROLLARE QUANTO SEGUE:

CHE L'UNITÀ SIA CHIUSA CORRETTAMENTE E CHE TUTTE LE MANDATE SIANO COLLEGATE ALLE TUBAZIONI.

CHE IL COLLEGAMENTO ELETTRICO RISPETTI LO SCHEMA, COMPRESE LA MESSA A TERRA E LA PROTEZIONE DEI CIRCUITI ESTERNI.

CHE TUTTI I COMPONENTI ELETTRICI SIANO COLLEGATI CORRETTAMENTE.

CHE LO SCARICO DELLA CONDENSA SIA COLLEGATO AL SISTEMA FOGNARIO.

CHE L'INSTALLAZIONE RISPETTI LE ISTRUZIONI RIPORTATE NEL MANUALE.

CHE ALL'INTERNO DELL'UNITÀ NON SIANO STATI LASCIATI STRUMENTI OD OGGETTI CHE POTREBBERO DANNEGGIARLA.

CHE I FILTRI SIANO PULITI.

ATTENZIONE!

È VIETATO INTERVENIRE SU E MODIFICARE I COLLEGAMENTI ELETTRICI DELL'UNITÀ, TALI AZIONI POTREBBERO COMPORTARE L'ANNULLAMEN-

TO DELLA GARANZIA.

SI CONSIGLIA L'IMPIEGO DI ACCESSORI FORNITI DALLA NOSTRA AZIENDA. IN CASO DI DUBBI RELATIVI ALL'USO DI ACCESSORI NON ORIGINALI, 

CONTATTARE IL FORNITORE.

LV: PIRMS PIRMOREIZ IESLĒDZAT IEKĀRTU, PĀRBAUDIET, VAI:

IEKĀRTA IR PAREIZI AIZVĒRTA UN VISI IZVADI IR PIESLĒGTI PIE CAURUĻVADU SISTĒMAS;

ELEKTRISKAIS SAVIENOJUMS ATBILST SHĒMAI, TOSTARP ZEMĒJUMS UN ĀRĒJO ĶĒŽU AIZSARDZĪBA;

VISI ELEKTRISKIE ELEMENTI IR PAREIZI PIEVIENOTI;

KONDENSĀTA DRENĀŽA IR PIEVIENOTA KANALIZĀCIJAI;

UZSTĀDĪŠANA IR VEIKTA ATBILSTOŠI ROKASGRĀMATAS NORĀDĪJUMIEM;

IEKĀRTĀ NAV PALIKUŠI INSTRUMENTI VAI CITI PRIEKŠMETI, KURI VARĒTU TO BOJĀT;

FILTRI IR TĪRI.

UZMANĪBU

IEJAUKŠANĀS IEKĀRTAS IEKŠĒJOS SAVIENOJUMOS UN TO PĀRVEIDOŠANA IR AIZLIEGTA, TURKLĀT TĀDĒJĀDI VAR TIKT ZAUDĒTA GARANTIJA.

IETEICAMS IZMANTOT MŪSU UZŅĒMUMA PIEDĀVĀTOS PIEDERUMUS.ŠAUBU GADĪJUMĀ PAR NEORIĢINĀLO PIEDERUMU LIETOŠANU SAZINIE-

TIES AR PIEGĀDĀTĀJU.

NL: CONTROLEER HET VOLGENDE VOORDAT HET TOESTEL VOOR HET EERST WORDT INGESCHAKELD:

HET TOESTEL MOET CORRECT GESLOTEN ZIJN EN ALLE UITGANGEN MOETEN ZIJN AANGESLOTEN OP HET KANAALSYSTEEM.

DE ELEKTRISCHE AANSLUITINGEN MOETEN OVEREENKOMEN MET HET BEDRADINGSSCHEMA, WAARONDER DE AARDING EN DE BEVEILIGING 

VAN EXTERNE CIRCUITS.

ALLE ELEKTRISCHE COMPONENTEN MOETEN VEILIG ZIJN AANGESLOTEN.

DE CONDENSAATAFVOER MOET ZIJN AANGESLOTEN OP DE RIOLERING

DE INSTALLATIE KOMT OVEREEN MET DE INSTRUCTIES IN DE HANDLEIDING.

ER ZIJN GEEN GEREEDSCHAPPEN OF ANDERE VOORWERPEN ACHTERGEBLEVEN DIE HET TOESTEL.

DE FILTERS MOETEN SCHOON ZIJN.

LET OP

WIJZIGINGEN EN AANPASSINGEN AAN DE INTERNE AANSLUITINGEN VAN HET TOESTEL ZIJN VERBODEN EN KUNNEN LEIDEN TOT VERLIES VAN 

GARANTIE.

WIJ RADEN HET GEBRUIK VAN DE DOOR ONS BEDRIJF GEBODEN ACCESSOIRES AAN. NEEM BIJ TWIJFEL IN VERBAND MET HET GEBRUIK VAN 

NIET-ORIGINELE ACCESSOIRES CONTACT OP MET UW LEVERANCIER.

RO: VERIFICAŢI URMĂTOARELE ÎNAINTE DE A PORNI UNITATEA PENTRU PRIMA DATĂ:

UNITATEA ESTE ÎNCHISĂ CORECT ȘI CĂ TOATE FITINGURILE SUNT CONECTATE LA CONDUCTE.

CONEXIUNEA ELECTRICĂ SE POTRIVEȘTE CU SCHEMA, INCLUSIV ÎMPĂMÂNTAREA ȘI PROTECŢIA CIRCUITELOR EXTERNE.

TOATE COMPONENTELE ELECTRICE SUNT CONECTATE CORESPUNZĂTOR.

DRENAREA CONDENSULUI ESTE RACORDATĂ LA CANALIZARE

INSTALAREA CORESPUNDE INSTRUCŢIUNILOR DIN MANUAL.

CĂ NICIUN INSTRUMENT SAU OBIECT CARE AR PUTEA DETERIORA UNITATEA NU A FOST UITAT ÎN INTERIOR.

FILTRELE SUNT CURATE.

ATENŢIE

INTERVENŢIILE ȘI MODIFICĂRILE CONEXIUNILOR INTERNE ALE UNITĂŢII SUNT INTERZISE ȘI POT DUCE LA PIERDEREA GARANŢIEI.

VĂ RECOMANDĂM UTILIZAREA ACCESORIILOR FURNIZATE DE COMPANIA NOASTRĂ. CONTACTAŢI FURNIZORUL DVS. ÎN CAZ DE DUBII CU PRI-

VIRE LA UTILIZAREA ACCESORIILOR NEORIGINALE.

Summary of Contents for VENUS AirGENIO Comfort

Page 1: ...ver 1 05 10 20 QUICK START CZ EN DE RU IT LV NL RO VENUS AirGENIO Comfort...

Page 2: ...E DEL CONSIGLIO INCLUSI RISPETTIVI EMENDAMENTI SOTTO I QUALI STATO INCLUSO IN CASO DI NORMALE UTILIZZO STANDARD SPECIFICATO NEL MANUALE DI COMANDO ED INSTALLAZIONE SICURO DURANTE LA VALUTAZIONE SONO S...

Page 3: ...I NICIODAT S UTILIZA I O UNITATE DE VENTILA IE DETERIORAT CZ POKUD JEDNOTKU NEVYBAL TE IHNED PO OBDR EN JE NUTN JEJ SKLADOV N VE VNIT N CH SUCH CH PROSTOR CH P I TEPLOT OD 5 C DO 40 C EN IF THE UNIT...

Page 4: ...NDERDELEN RO COMPONENTELE PRINCIPALE 2x 1x 4x 1x 1x 1x Comfort 2x Temperature sensors are located in the regulation box 1 2 2 6 5 3 4 4 7 7 1 1 2 3 4 5 6 6 7 8 9 9 IT 1 CONNESSIONE DELLA TUBATURA ARIA...

Page 5: ...R DE KANALEN RO INSTALAREA SENZORILOR DE TEMPERATUR CANAL min 80cm min 80cm INT 1 51 52 orange 4 ROZM RY A B C D 350 380 40 250 350 380 40 250 350 380 40 250 350 380 40 250 350 380 40 250 350 380 40 2...

Page 6: ...DIMENSIONS DE ABMESSUNG RU IT DIMENSIONI LV IZM RI NL AFMETINGEN RO DIMENSIUNI HRV14 HRV15 HRV30 HRV50 HRV70 1114 960 26 31 15 57 20 20 1000 125 265 165 53 10 M8 159 555 270 135 20 515 65 1051 193 14...

Page 7: ...CHNICK INFORMACE EN TECHNICAL INFORMATION DE TECHNISCHE INFORMATIONEN RU IT INFORMAZIONI TECNICHE LV TEHNISK INFORM CIJA NL TECHNISCHE INFORMATIE RO INFORMA II TEHNICE CZ JEDNOTKA MUS B T PROVOZOV NA...

Page 8: ...ROZM RY JSOU VHODN PRO SERVISN P STUP NEHO LAV MA TERI LY NESM BR NIT SAC A V FUKOV OTVORY BEZPE N VZD LENOST HO LAV CH MATERI LU OD VSTUPN HO HRDLA JEDNOTKY JE 500 MM EN THESE DIMENSIONS ARE SUITABLE...

Page 9: ...AZIONE 16 BULLONI M8 NON IN DOTAZIONE DE ACHTUNG 8XM8 GROSSE UNTERLEGSCHEIBEN IM LIEFERUMFANG 4XM8 GEWINDESTANGEN NICHT IM LIEFERUMFANG ENTHALTEN 16XM8 MUTTER NICHT IM LIEFERUMFANG ENTHALTEN RU 8XM8 4...

Page 10: ...LTERNATIVA DUE O PI PERSONE DOVRANNO MANTENERE L UNIT FINO AL CORRETTO FISSAGGIO LV UZMAN BU TAPSKR V M IR J SP J NOTUR T IEK RTAS SVARS EMOT V R IEK RTAS SVARU IR NEPIECIE AMS IZMANTOT PIEM ROTU PACE...

Page 11: ...HETHER THE UNIT IS TILTED SO THE CONDENSATE MAY RUN OFF FRE ELY WE SUGGEST 5 TILT SEE THE FIGURE BELOW THE SIPHON MUST BE CONNECTED AND SEALED PROPERLY IN THE HEAT EX CHANGE UNIT DE BITTE BEACHTEN PR...

Page 12: ...I RIPORTATE NEL MANUALE E LE NORME E LE DIRETTIVE NAZIONALI IN VIGO RE GLI SCHEMI ELETTRICI RIPORTATI SUL PRODOTTO HANNO PRIORIT SUGLI SCHEMI RIPORTATI NEL MANUALE PRIMA DELL INSTALLAZIONE CONTROLLARE...

Page 13: ...GRAM INCLUDING EARTHING AND PROTECTION OF EXTERNAL CIRCUITS THAT ALL THE ELECTRIC COMPONENTS ARE PROPERLY CONNECTED THAT THE CONDENSATE DRAIN IS CONNECTED TO THE SEWAGE THAT THE INSTALLATION CORRESPON...

Page 14: ...S PIEDERUMUS AUBU GAD JUM PAR NEORI IN LO PIEDERUMU LIETO ANU SAZINIE TIES AR PIEG D T JU NL CONTROLEER HET VOLGENDE VOORDAT HET TOESTEL VOOR HET EERST WORDT INGESCHAKELD HET TOESTEL MOET CORRECT GESL...

Page 15: ...81 82 55 56 Registre Air Rejet 77 78 23 24 230VAC POMPE DE CIRCULATION 76 75 25 26 49 50 59 60 OUTPUT DX ON OFF Sortie pour unit exterieure 72 71 CONTACT ERREUR Commande distance 63 64 CONTACT EXTERNE...

Page 16: ...e 1995 ver 1 05 10 20 www 2vv cz 2VV s r o F blovka 568 533 52 Pardubice Czech Republic support 2vv cz 420 466 741 811 195027 30 126 E mail vent impex mail ru 78124073359 FULL MANUAL INSTALLATION DE E...

Reviews: