![ZYGO KMS-310 Скачать руководство пользователя страница 102](http://html1.mh-extra.com/html/zygo/kms-310/kms-310_supervisor-manual_943104102.webp)
5-16
Chapter 5: System Setup
5.
Enter the size of the microscope aperture that is to be used for all
measurements in this program.
6.
Press [SELECT] or [ESC] to set the new aperture.
Calibrate Horizontal Settings
To calibrate the horizontal settings:
1.
In the Standard Horizontal section of the Calibrate screen, highlight the
Pitch
field and press [SELECT].
2.
Enter the pitch value you want to physically calibrate to.
L
Note: Refer to the values provided on the Standard Certification Sheet for the pitch and
line size you wish to calibrate to.
3.
In the Standard Horizontal section of the Calibrate screen, highlight the
Line
field and press [SELECT].
4.
Enter the line dimension value.
5.
Press [SELECT] or [ESC] to set the line.
Calibrate Vertical Settings
To calibrate the vertical settings:
1.
In the Standard Vertical section of the Calibrate screen, highlight the
Pitch
field and press [SELECT].
2.
Enter the pitch value you want to physically calibrate to.
L
Note: Refer to the values provided on the Standard Certification Sheet for the pitch and
line size you wish to calibrate to.
3.
In the Standard Horizontal section of the Calibrate screen, highlight the
Line
field and press [SELECT].
4.
Enter the line dimension value.
5.
Press [SELECT] or [ESC] to set the line.
Содержание KMS-310
Страница 10: ...Contents viii...
Страница 11: ...About This Manual Intended Audience Manual Organization Conventions Contacting Technical Support 1...
Страница 33: ...System Overview Product Overview Subsystem Overview Functional Overview 3...
Страница 51: ...User Interface Overview Software Controls Software Organization 4...
Страница 53: ...KMS 310 400 Supervisor s Manual 4 3 Figure 4 1 Key Software Elements 1 2 3 4 5 6 7 1 2 3 4 5 6 7...
Страница 119: ...Creating Automated Scripts Overview Script Creation Script Locator Script Commands 6...
Страница 219: ...Operation Overview Access and Exit the Supervisor s Menu Set up a Program Measure Manage Measurement Data 7...
Страница 266: ...7 48 Chapter 7 Operation...
Страница 267: ...Maintenance Overview Lamp Replacement and Alignment Stage Maintenance Electronics Cabinet Maintenance System Cleaning 8...
Страница 292: ...8 26 Chapter 8 Maintenance...
Страница 293: ...Error Messages System Error Messages Script Error Messages 9...
Страница 297: ...Glossary...
Страница 304: ...I 4 Index...