ZXC10-BTS (V5.4) Installation Manual
2-8
Category Name
Small tools
One hacksaw (with several saw blades)
One pair of sharp-nose pliers (8”)
One pair of diagonal pliers (8”)
One pair of slip joint pliers (8")
One pair of vices (8”)
One needle file set (medium sized)
Tweezers
One paintbrush
One pair of scissors
One hot blower
One solder sucker
One pair of hydraulic pliers
Crowbar
Auxiliary tools
Pulley block
Rope
Ladder
Forklift
Table 2.2-2 Instruments Needed
Instrument Name
Manufacturer
Spectrum analyzer (needed in some
special cases)
HP
Base station tester
SITE MASTER
Test-purpose MS
Qualcomm
Compass
Multimeter
Field strength tester (needed in some
special cases)
2.3 Preparation of Technical Documents
The technical documents to be prepared before the commissioning of the equipment
are as follows:
1.
Project Survey Report, BTS System Project Design and Engineering Drawing,
and Environment Acceptance Report.
The Project Survey Repo
rt should be completed by the engineering staff sent by
the equipment supplier during the onsite survey. If engineering staff cannot
Содержание ZXC10-BTSB I2
Страница 1: ...ZXC10 BTSB I2 V1 0 cdma2000 System Base Transceiver Station Installation Manual ZTE CORPORATION ...
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 22: ......
Страница 38: ......
Страница 54: ......
Страница 68: ......
Страница 104: ......
Страница 112: ......
Страница 140: ......
Страница 158: ......
Страница 172: ......